施工工艺大全套管成孔灌注桩施工(国外英文资料).docVIP

施工工艺大全套管成孔灌注桩施工(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工工艺大全套管成孔灌注桩施工(国外英文资料)

施工工艺大全套管成孔灌注桩施工(国外英文资料) Construction of cast-in-place pile with casing hole Casing bored pile with hammer pile machine or vibration pile machine with valve pile tip or reinforced concrete precast pile tip (boots) steel hammer or vibration into the soil, then pouring concrete, while the volume field machine extubation or edge vibration PIPE-DRAWING pile. The technology is characterized in that: it is adaptable to complex formation, can play a larger small pile pipe section pile, bearing capacity; a casing, can avoid hole collapse, bottleneck, pull off, shift, void defects, quality and reliable; can sink can pull, fast construction speed, high efficiency, simple operation and safety. The process standard is applicable to industrial and civil construction, and the foundation soil is generally cohesive soil, silt and mucky soil. The bored sand and miscellaneous fill soil layer is made of bored pile with casing tube. The first chapter: material requirements 1. cement With 425 ordinary cement, slag cement or volcanic ash cement, requiring fresh, no caking. 2. stones Gravel diameter is not greater than 50mm; gravel particle size is not greater than 40mm; reinforced piles, gravel particle size should not be greater than 30mm, and should not be greater than the minimum steel clearance of 1 / 3. 3. reinforcement The varieties and specifications shall be adopted according to the design requirements, and the factory certificate shall be issued. The second chapter mainly implements equipment 1. hammer pile driving equipment For general hammer piling machine, such as drop hammer, diesel hammer, steam hammer, etc., by pile frame, pile hammer, pile pipe, etc., pile diameter is 270 ~ 370mm, length 8 ~ 15m. 2. vibratory pile driving equipment Including DZ60 or DZ90 type DJB25 type walking type vibration hammer, Lycra, hoist, pressure device, pipe pile and pile toe or reinforced concrete precast pile boots. The diameter of the pile pipe is 220 to 370mm, and the length is 10 to 28m. An

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档