挑专项方案(国外英文资料).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
挑专项方案(国外英文资料)

挑专项方案(国外英文资料) This article is contributed by keviRTF documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Suspension fastener, steel pipe scaffold, construction scheme A, 1 basis, construction of steel tubular scaffold safety technical specifications (JGJ130-2001, 2) construction manual Fourth Edition 3, construction safety inspection standards JGJ59-99 4, construction work safety technical specifications (JGJ80-91 5), code for design of steel structure (GB50017-2003) 6, the structures load code (GB50009-2001) 7, the engineering construction drawings and design changes. Two project overview Liaohai salt real estate development company limited in the engineering building, designed by Beijing SKYWORTH era Construction Company Limited design, project scope for the south to the road, north to the East on the road, Ping Dong Jie, Xilin IRS, the total construction area of 23099.98 square meters; the building height is 85.6m, the underground one layer, 22 on the ground floor, storey underground respectively: 4.5m, 5.1m first floor, two 3.9m, three 3.6m layer, standard layer 3.4m, 5.4m layer, equipment layer is 5.1m. The scaffolding engineering four layer below the temporary shelves (full house) and landing double scaffolding, temporary shelf shelf with full house floors by oversailing, underground backfill is completed, decoration engineering construction and erection of the 1-4 layer from the ground floor floor scaffolding, scaffold riser pad under concentrated force are sharing 1000*250*50 board distributed load and other data like cantilivere. From the 4 floor to the 22 floor, the use of I-beam cantilever, pick a total of two times, respectively, on the fourth and thirteen levels. Three, material selection and quality requirements, material selection 1 outer diameter of 48, ordinary welding steel pipe wall thickness of 3.5mm, the outside of the tube wall unified brus

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档