安全管理资料(国外英文资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全管理资料(国外英文资料)

安全管理资料(国外英文资料) Safety responsibility target decomposition I. general objective of the project: the person in charge: 1, the establishment of responsibility system to prevent casualties, the frequency of injuries will be controlled below 1.5 per thousand. 2, strict civilized construction, and ensure the quality of the project, safe delivery. Guarantee measures: strengthen the construction site safety production management, strict implementation of the three grade education workers and certified operating system, and in strict accordance with the examination and approval of the construction plan and operation of construction safety measures, strict weekly and daily arrange to carry out safety inspection of the construction site, and the establishment of safety check and examination system, strict inspection system, mechanical field temporary power, such as the scaffold, to ensure safe production. Two, team goals: responsible person: Conduct weekly inspection of teams and groups. 1 、 electrician team: responsible person: Objective: strictly follow the TN-S system operation and check the acceptance. Measures: strictly regulate the operation of construction requirements, establish safety record certificate system, foreign power line protection in accordance with the requirements of the distribution box under the deflectors arranged neatly, and casing line laying, buried steel pipe protection, hand-held lighting and dangerous places using safety voltage, the switch box is installed correctly, fortification awning, according to the provisions of the protection of ground zero. A machine a gate of a leak of a switch box, and each box lock, ensure the clean and free of debris, daily on site inspection tour. 2, shelf group: responsible person: Objective: to set up scaffolding in strict accordance with the specifications, and ensure the safety of the use of the frame and acceptance, and meet the needs of the project. Measures: according to the erection plan, the foundation will

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档