一般施工员考试题(国外英文资料)
一般施工员考试题(国外英文资料)
First, fill in the blanks (each of 2 points, a total of 15 questions)
1, before admission must be (), the project department and team three safety education.
Answer: the company.
2, admission must take safety card and ().
Answer: safety helmet.
3, the cast-in-situ concrete pit when the groove depth is greater than (m) should be set in concrete chute.
Answer: 3.
4, block, small die stacking height shall not exceed (m).
Answer: 1.5 meters.
5, the non floor scaffold structure (lateral) every layer should set a level of network.
Answer: 4.
6, groove, pit Mizobe, 1 meters outside the pile height shall not exceed (m).
Answer: 1.5 meters.
7, artificial excavation earthwork, two lateral spacing of not less than (m).
Answer: 2 meters.
Not inverted, 8 oxygen and acetylene bottle use, two bottles of spacing of not less than 5 meters away from the fire, spacing of not less than (m). Answer: 10 meters.
And after pouring must use the expansion joint structure in construction, 9 (fixed) protective cover.
Answer: fixed.
10, the construction site scaffolding erection (should).
Answer: timberman.
11, attached scaffold in the ascending and descending operation, must be set (name) command staff, unified command.
Answer: 1.
12, scaffolding must face (scaffold).
Answer: shop.
Lap length of not less than 13, when the lap wall foot board () cm.
Answer: not less than 20 cm.
14, electric welding, welding wire () using other metal substitutes.
Answer: No.
15, welding machine on one side of the power line length does not exceed (m).
Answer: 5 meters.
Two, choice (each of 2 points, a total of 12 questions)
1, not cooked lentils (eat).
1) 2) can not be
A: no..
2, the paint industry (welding) working place and fire operation.
1) 2) can not be
A: no..
3, height refers to where the falling datum () meters above, may fall height for homework.
1) 22) 2.5
Answer: 2.
4, hands stained with the water, the spray machine (electrical switch).
1) 2) can not be
A: no..
5, ladder axis at the t
您可能关注的文档
- yuhao(国外英文资料).doc
- ZB206+V1.3版电池容量内阻综合测试仪使用说明书(国外英文资料).doc
- Zmud详解(国外英文资料).doc
- ZTE认证考题-管线专业(国外英文资料).doc
- zj第4章 电机与电力拖动(国外英文资料).doc
- ZT]魔兽争霸的BUG(国外英文资料).doc
- ZT驴友的一些事故1(国外英文资料).doc
- ZXLDG系列电磁流量计电磁流量计说明书(国外英文资料).doc
- [摘要] 采用脉动法对两栋钢框架结构房屋的动力特性进行了现场实测,...(国外英文资料).doc
- [大理石]浅谈几种人造大理石_建材-五金_买购网(国外英文资料).doc
- 2024年证券分析与咨询服务项目投资申请报告代可行性研究报告.docx
- 2024年铬酸酐项目资金申请报告代可行性研究报告.docx
- 2024年清洁胶项目资金申请报告代可行性研究报告.docx
- 2024年肉松饼项目投资申请报告代可行性研究报告.docx
- 2024年陆上泵项目资金需求报告代可行性研究报告.docx
- 2024年未硫化复合橡胶及其制品项目资金需求报告代可行性研究报告.docx
- 2024年精密温控节能设备项目资金筹措计划书代可行性研究报告.docx
- 2024年汽车覆盖件模具项目资金筹措计划书代可行性研究报告.docx
- 宋词行书钢笔字帖.pdf
- 我的暑假生活作文三年级300字10篇.pdf
文档评论(0)