- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2007年一级建造师市政实务真题及答案(国外英文资料)
2007年一级建造师市政实务真题及答案(国外英文资料)
Full water test and tightness test D. full water test and tightness test
14. heat pipe compensator, the compensator in the pipeline before installation, and (C) shall not be fixed.
A. B. C. guide bracket hanging bracket fixed bracket D. rolling bracket
The 15. station is the city gas pipeline network system to adjust and stabilize the pressure pipe network facilities, usually by the regulator, and the valve (B), safety device, by-pass pipe and instrument etc..
A. B. C. filter drain trap D. compensator
16. according to the Regulations on-site construction requirements, plan approved projects (C) shall apply to the relevant departments for the construction permit procedures.
The A. project general contracting unit B. general construction contractor C. D. construction units supervision units
17. characteristics of suspended ash pellets is two (C).
A. lime powder and pulverized coal and aggregate ratio of 15:85 to 20:80 B. in the mixture of granular material can form a skeleton
C. is easy to produce shrinkage and dry shrinkage crack of D. is widely used in highway
The machine with 18. prestressed construction should be calibrated periodically (D).
A. owners designated metrology institutions designated B. supervision institution of metrological technology
The legal metrology institution authorized by the competent department of construction enterprise internal C. D. measurement technology institutions
19. gas pipeline installation personnel must be trained and qualified in 1, when the intermittent installation over time (B), again before taking the post re examination and evaluation technology.
A.3 B.6 months C.12 months D.18 months
According to the relevant provisions of the 20. code for construction and acceptance of subway engineering, tunnel by drilling and blasting method, must be prepared in advance of blasting scheme, prior to the implementation of the need to carry out the program (D).
The approval of A. newspaper owners approved B. re
您可能关注的文档
- (宋明清建筑风格特征与代表构造).JPG(国外英文资料).doc
- (八年级数学)图形的全等(二)—全等三角形的识 …(国外英文资料).doc
- (平面设计人必备的封套尺寸)(国外英文资料).doc
- (人教)高中英语第二册下12单元测试题(国外英文资料).doc
- (电大毕业论文范文)对10例气管切开患者的临床医学论文发表(国外英文资料).doc
- (中秋节快乐)离散大家上机第2题(国外英文资料).doc
- (建筑工程)第1章3(国外英文资料).doc
- (第一卷)(国外英文资料).doc
- .Net Memory Profiler(国外英文资料).doc
- 00301.中学化学实验现象总结(国外英文资料).doc
最近下载
- 2025年广东省中考物理试题卷.docx
- 中药栽培理论知识考核试题及答案.docx VIP
- 《中华人民共和国劳动合同法》 必威体育精装版版(2025精).docx VIP
- 39-JJF 1259-2018 医用注射泵和输液泵校准规范.pdf VIP
- (2025)新课标《义务教育数学课程标准(2022年版)》测试题(附含答案) .pdf VIP
- 投标文件编制培训.pdf VIP
- 模块化箱式房屋安装、验收技术规范.pdf VIP
- 美剧friends的剧本 第七季.doc VIP
- 《中药栽培技术》期末考试复习题库(含答案).pdf VIP
- 事业单位《公共基础知识》全真模拟卷(三)与参考答案及解析.doc VIP
文档评论(0)