- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
08和13定额对比(国外英文资料)
08和13定额对比(国外英文资料)
Construction valuation quota
The first chapter A earthwork (note 2013 change)
First, the artificial soil (stone).
1, sixth: artificial dig hole pile quota, suitable for the construction in security conditions; (2013 quota increase)
2, eighth: artificial dig hole pile, pile in vertical transportation by way of artificial consideration. If the depth is more than 12M, less than 16m within the 12m project according to the artificial amount multiplied by the coefficient multiplied by the coefficient 1.5 calculation 1.3,20m. In the same hole soil type is not at the same time, according to the fixed weighted calculation, if there is a flowing sand and mud, further processing. (2013 quota increase)
Two, mechanical earth
1, Fourth: need artificial auxiliary excavation in excavation machinery (including dressing, bottom masonry slope) of the project, calculated according to the construction organization design approved by 15C thickness, M thickness calculation without artificial excavation construction organization design, the implementation of the corresponding quota project by a factor of 2 (2013 of quota increase);
2, fifth: mechanical excavation of soil between piles, according to the actual excavation volume (excluding pile volume size), the corresponding item multiplied by a factor of 1.50; (2013 quota increase)
3, tenth: loader, loader installed silt soil project execution by a factor of 1.50 sand flow; (2013 quota increase)
4, eleventh: the mechanical operation, perform mechanical transport of silt and sand flow coefficient of 1.50 multiplied by the corresponding project. (2013 quota increase)
The second chapter B foundation treatment and slope supporting project (2013 change)
A mechanical replacement, foundation soil, soil and sand into preparation. (2013 quota increase)
Two, according to the 400T.M maximum foundation compaction compaction machinery system, more than a fixed range, measured separately added. (2013 quota increase)
Five, soil anchor:
您可能关注的文档
- (宋明清建筑风格特征与代表构造).JPG(国外英文资料).doc
- (八年级数学)图形的全等(二)—全等三角形的识 …(国外英文资料).doc
- (平面设计人必备的封套尺寸)(国外英文资料).doc
- (人教)高中英语第二册下12单元测试题(国外英文资料).doc
- (电大毕业论文范文)对10例气管切开患者的临床医学论文发表(国外英文资料).doc
- (中秋节快乐)离散大家上机第2题(国外英文资料).doc
- (建筑工程)第1章3(国外英文资料).doc
- (第一卷)(国外英文资料).doc
- .Net Memory Profiler(国外英文资料).doc
- 00301.中学化学实验现象总结(国外英文资料).doc
最近下载
- GP-150中文说明书.pdf VIP
- 中文说明书-船舶自动识别系统(AIS)FA-150版.docx VIP
- FAR21X7_28X7雷达中文操作说明书.pdf VIP
- 2025届广东深圳市物理高一第一学期期末教学质量检测试题含解析.doc VIP
- 广东高一物理第一学期期末试题.doc VIP
- 水资源及其利用——人类拥有的水资源及其分布.pdf VIP
- FURUNO古野OZS56490D_NX700使用说明书.pdf VIP
- 青岛啤酒股份有限公司成本控制存在问题及对策研究.doc
- 生物安全柜使用与维护保养记录表.doc VIP
- 输变电工程施工质量验收统一表式(变电工程电气专业).docx VIP
文档评论(0)