- 1、本文档共60页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目管理在滚筒连续化生产技术提升研究中的应用论文
ABSTRACT
The metallurgy slag which accounts for more than 70% of steel mill
solid waste is the largest steel mill pollution. Rapid processing and
utilization of slag have become a worldwide problem of steel industry.
Baosteel started the new slag processing technology research in
1995. And Baosteel started to install and test production A-Ι slag type
processing device in May 1998. On the basis of this technology Baosteel
and MCC Baosteel made a second generation, then the new generation
was put into industrialized production in the first quarter of 2004 called
A-II type slag processing equipment. Both of the slag processing
equipment are dealing with continuous slag, but the integral effect has not
been very satisfactory. The main problem is frequent repairing crack and
the leakage of slag. Therefore, how to solve the main problem becomes
steel industry’s responsibility.
This paper mainly focuses on how to improve the roller’s ability to
do continuous production using the theory of project management. Finally,
the pre-established continuous production ability is used for judging the
project’s results.
First, a research method and a project organization structure must be
established. In the planning process, an aim of our project is made by
analyzing Pareto charts and SMART principles. And the aim is reducing
the cracking times along the mouth and the leakage of drain slag along
the chute, so that the roller’s continuous production time can increase 120
hours per month. Second, make work breakdown diagram and give the
responsibility matrix, so that a clearer division of the project module is
made. Then in the implementation phase, we use some quality
management too
您可能关注的文档
最近下载
- 2025医院卫生院党支部书记述职报告(必威体育精装版版).docx VIP
- Femap中文学习全面指南.pptx VIP
- 人工智能的机器学习与深度学习.pptx
- 武汉市2025届高中毕业生二月调研考试 数 学 试 卷(附答案).docx VIP
- 核心素养导向表现性评价案例 北师大版小学数学五年级上册 分数小数互化.docx
- 2025年消防设施操作员(中级技能操作考核)考试题库(全新版).pdf VIP
- 危机公关的跨文化管理与传播.pptx VIP
- 公立医院加强经济运营管理的探索(PPT 97页)【97页】.pptx VIP
- 哈尔滨工业大学介绍.pptx VIP
- 烟草法律法规零售户培训.pptx
文档评论(0)