骨干道二灰结石施工质量监理小结(国外英文资料).docVIP

骨干道二灰结石施工质量监理小结(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
骨干道二灰结石施工质量监理小结(国外英文资料)

主干道二灰结石施工质量监理小结(国外英文资料) The main road project of zhenjiang huaco eco-electroplating specialty area The construction quality supervision of the two grey stone structures One. Engineering profiles Main road engineering from west town road, he went on the road in the east is zhenjiang huake ecological electroplating technology development co., LTD., connecting the town road in the park a east-west road, road total length of 971.45 m. Two grey stone structure design requirements for 32 cm thick layer, the ratio of for 6, 12, 82 (lime, fly ash, gravel, compaction degree of 98% or more (heavy compaction), top surface deflection 39, or less seven days the unconfined compressive strength acuity 0.8 Mpa, the construction of mixing adopted concentrated in two layer paving and compaction construction method. This procedure starts on July 27, 2008, and the completion date is August 11, 2008, which lasts 16 days, including 8 days on sunny days and 8 days on rainy days. This project is designed by zhenjiang city planning and design institute, zhenjiang runyang transportation engineering, and the supervision of the construction supervision of the xinghua project construction supervision in zhenjiang city. The supervision on the basis of Construction contract, supervision contract; Construction drawings and relevant design changes; Evaluation criteria for quality acceptance of municipal road works (cj1-90); The basic construction and acceptance standards for coal ash and limestone roadways (cjj4-97); (jtj051-93). Laws and regulations promulgated by the competent department of state and administration. Engineering quality supervision Construction preparation stage 1-1, the construction organization design and the site machinery, personnel, materials and so on, meet the starting conditions. 1-2, the middle line, slope, width and flatness of 10% of the grey soil layer; All meet the design requirement. 1-3, check the compaction of 10% of the dirt layer and the bending test report, all

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档