鑫运公司11月份义务总结及12月份义务计划2(国外英文资料).docVIP

鑫运公司11月份义务总结及12月份义务计划2(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
鑫运公司11月份义务总结及12月份义务计划2(国外英文资料)

鑫运公司11月份工作总结及12月份工作计划2(国外英文资料) At the end of this month, 28 articles were collected, and two were adopted. October rationalization proposal on: 1, the underground working face ram diameter is small, and the air supply distance, dilute the gas slowly, need to change the diameter 800 ram, ensure the safety in production has been implemented. 2, underground mining bases on a temporary water storehouse, avoid face the sludge water, for initiating explosive device during shutdown overhaul sealed, not according to the required time to complete the task. The plan is to be completed before the end of November. Four, this month influence factor and existent problem 1, the factors affecting the The change of belt in the track is 2.5 hours. The failure of the winch of the winch affects four hours; The water pump was damaged, and the displacement of water pump was 181 hours. The maintenance machine affects 8 hours; Installation of the scraper for four hours; To repair the drum for four hours; The hydraulic tubing of the excavator is affected by 2.5 hours. The failure of the scraper affected 5.5 hours; To change the ventilator for eight hours; A failure effect of two belt roller for 3.5 hours. To explore a class; The cumulative effect was 223 hours. The change of belt will affect 2.5 hours. The pump was damaged and the water pump was changed for 215 hours. Sensor breakage affects one hour; 34 hours of maintenance of excavator failure; Two hours of change of the rig back to the tubing. The frequent power failure of the driving machine affects 10 hours; The failure of the machine switching switch affected 5 hours; The second drum affects 3.5 hours; 10 hours of damage to the surface of the excavator. 8 hours of contact with a windpipe; A class of water exploration affects 290 hours. The 9101 return wind will affect 2.5 hours due to the change of belt in track. The drainage affects 134 hours, the main reason is that no full-time staff, no silt, no water pit, cause the pump to burn

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档