配电箱壳体技巧交底改(国外英文资料).docVIP

配电箱壳体技巧交底改(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
配电箱壳体技巧交底改(国外英文资料)

配电箱壳体技术交底改(国外英文资料) Screw the bolts one by one. The three JDG pipe is joined by threaded joint of the box casing, and the line tube is two to three wire buckles in the distribution box, and the length is uniform. Figure 4.1.3-1, in the case of the box casing. Dark assembly electrical box installation: 1 case of case with the wall of the living wall, use a horizontal ruler or a ruler to check. The connection of the pipe is the same as the light assembly box. The box is fixed, and then the strength is not less than the M10 (1:2.5) cement mortar fills the surrounding area and is smooth, and the water is applied in the area around the opening of the cave. If the bottom of the case and the outside wall are in the same place, should be in the outside wall of fixed metal net, do the metope to wipe the dust, not to wipe the dust on the bottom board of the box. The 4 dark assembly box installation schematic is shown in figure 4.3-2, the inside of the box is pointing upwards. 4.1.4 pipe sealing When the distribution box is installed, plug the head of the pipe and prevent the pipe from being blocked. 4.1.5 ground wire installation The line and tube, line and box are intergrafed with 4mm2 bare copper wire. 2 Ming assembly electrical box expansion bolts and box body, line works 4mm2 bare copper wire for cross-connection. The 3.jdg pipe shall be connected with a special ground connection and shall not be used for sealing the ground wire. 5.1 control points 5.1.1 key points and key links To locate the distribution box according to the elevation line of the earth, the construction teams are required to check with the horizontal and horizontal pipe. The distribution box is pressed to the end of the wall, and the construction teams are required to be constructed according to the construction process, and the box is finished in the box Special precautions note Construction enterprises Inspect the conclusion of the supervision (construction) unit Disclosure of Date of the year Team lea

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档