- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
路面路肩施工计划(国外英文资料)
路面路肩施工方案(国外英文资料) Road shoulder construction organization design Road shoulder construction organization design 1, compilation basis, (3) the design of the construction of two stages. Construction bidding documents for highway engineering standards (2009); Article 1.3. The construction tendering supplementary technical specifications; 1.4, quality control standards of highway engineering in Inner Mongolia autonomous region (civil engineering); 1, evaluation criteria for quality inspection of highway engineering (JTG f80/1-2004). 2, project summary This project is the section of the contract with the length of K1 + 240-k17 + 000, and the line is 15.76 Km long. My road shoulder is the shoulder of the dirt road, which is 75cm wide. The C25 concrete precast brick is installed after the central separation belt is reclaimed. 3, the progress plan of the construction organization The road shoulder is scheduled to start on June 16, 2013, followed by the construction schedule of the pavement structure, completed in September. Main personnel, mechanical equipment arrangement staffing 4.1.1, major construction management personnel Order no. name Post service Responsibility and scope of work For note one The project manager The project leader 2 The project general Technical director 3 Minister of environmental protection Safety quality control 4 Minister of engineering Field technology management 5 Test engineer Test management 6 The operator Field test detection 7 hon Site safety 8 Technical director On-site technical 9 The technician Field measurement 10 The quality engineer Site construction quality 4.1.2, site construction manpower The serial number Type of work Job content The number of note one Ordinary workers Backfill, compaction and brick 40 2 The driver driving 4 Dump car and water cart 3 The driver of the loader driving one 4 Excavator driver driving one Installation of construction machinery and measuring instruments The construction machinery equipment is equipped w
有哪些信誉好的足球投注网站
文档评论(0)