- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
落成百分比法应当慎用(国外英文资料)
完工百分比法应该慎用(国外英文资料) The completion percentage method should be used with caution Completion percentage method is a construction contract and service provided two trades form to confirm the main method of income and expenses, accounting standard for business enterprises, determine the percentage completion of a work schedule, technical measure and cost ratio three methods. Three methods, the work progress and technical measurement method is limited to some engineering workload is easy to determine and can be measured, using range is very small, the cost ratio method with total cost is expected to be completed the proportion of the total cost as a percentage, is the most commonly used, the calculation method is easy to operate. Happened under the cost ratio method, the current project cost usually constitute the current operating cost in the income statement, according to cost ratio, to determine the current revenue and operating profit. The application of this method depends on two cost factors, one for the cost of engineering and the estimated total cost of the contract. According to the revenue recognition principle stipulated in the accounting standards, reliably estimate the result of the contract is the precondition of completion percentage method using, reliably estimate, the so-called standards is the most important one in the gross inflow of economic benefits out of or in connection with the contract. Under the cost ratio method, the cost of the two key factors are all from within the enterprise, the completion percentage of natural lack of objectivity, if again by the enterprise to judge whether economic interests can flow into the subjective, confirmation of the revenues and expenses on provides more space for the enterprise. Can only say that from the accrual basis of accounting standards starting point is good, but there is no objective standard to restrict or control the situation, the use of simple cost ratio method, and the robustness of a accounting
您可能关注的文档
最近下载
- 简易版房屋买卖合同范本(精选20篇) .pdf VIP
- 5义乌市小学数学六年级上册第五、六单元独立作业.pdf VIP
- 【春秋航空 空客A320】ATA 22 自动飞行系统.pdf VIP
- 组织者用手册16.pdf VIP
- 语文阅读策略单元作业设计初探——以统编版语文教材四上“提问策略”单元为例.pdf VIP
- 《Python快速编程入门(第3版)》PPT完整全套教学课件.pptx VIP
- YD∕T 814.1-2013 -光缆接头盒 第1部分:室外光缆接头盒.pdf VIP
- 设计交底记录(示例).doc VIP
- 【春秋航空 空客A320】ATA 25 飞机舱内设备系统-已修改.pdf VIP
- GB51145-2015 煤矿电气设备安装工程施工与验收规范.docx
有哪些信誉好的足球投注网站
文档评论(0)