第六章 造就项目进度把持(国外英文资料).docVIP

第六章 造就项目进度把持(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第六章 造就项目进度把持(国外英文资料)

第六章 建设项目进度控制(国外英文资料) This is the order in which work is required in process and organization. A project includes a lot of work, workshop of the logical relationship is very complicated, should use simple and accurate way to give expression to this logical relationship, is advantageous for the network graph drawing. What are the basic rules for drawing a bitmap? Answer: (1) the node number of network graph should follow two rules. The number of an arrow node is greater than the number of the end of the arrow. In a network diagram, all nodes cannot be duplicated. (2) in the network diagram, no nodes are allowed to have the same arrows. (3) in a network diagram, only one starting point is allowed, and only one endpoint node is allowed. Loop loops are not allowed in the network diagram. (5) an arrow line in the network diagram must connect two nodes. An arrow line must have a start node and a completion node, not allowing another arrow line from the middle of an arrow line. (6) in the network diagram, there is no bidirectional arrow or no arrow line segment. (7) network diagram should be correctly express the logical relationship between the work, no redundant virtual work as far as possible at the same time, draw a network diagram reflects the logical relationship between work, as the schedule of work should be given at the same logical relationship. Mapping the basic rules of a single codename network diagram? Answer: (1) not allow loop circuit. (2) the number of the work is not allowed to repeat, and any number can only represent the only work. (3) there is no bidirectional arrow or no arrow line segment in the network diagram. (4) if the single code network diagram (except for multi-objective single code network diagram) at the end of the beginning and some of the work lack the necessary logic relation, the starting point must be increased at the beginning and end of virtual node and destination node (or). For the first starting point of the node and the final dest

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档