- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第03节 导流设计流量(国外英文资料)
第03节 导流设计流量(国外英文资料) Section 3 flow design flow ???? Flow design flow is the main basis for selecting the guide flow scheme and designing the guide building. The flow design flow is usually determined by the analysis of the guide flow and the lead time. One, guide flow standard ????? Broadly, the diversion standard is that the choice of diversion design flow for the standard of construction diversion design, it includes the early diversion, dam detention of diversion standard, etc. ????? Early stage of construction diversion standards, according to the water conservancy and hydropower project construction organization design norms, should be first based on the following index of the diversion buildings, diversion buildings can be divided into Ⅲ ~ Ⅴ level. In accordance with the level and type of the diversion building, the corresponding flood recurrence period shall be selected as the initial standard of diversion during the specified period. ????? In fact, the selection of the guide criteria is influenced by many random factors. If the standard is too low, the construction safety is not guaranteed. On the other hand, makes the diversion engineering design size is too big, not only increase the cost of diversion, and probably because of its size is too big cant finish, the passive situation caused by engineering construction. Therefore, the determination of the standard of large engineering guide flow should be combined with the analysis of risk degree to make the selection criteria more economical and reasonable. Second, the period of diversion ???? In the process of construction, different construction diversion methods and water and drainage structures can be used in different stages. The order in which different flow patterns are combined is usually called a diversion program. Diversion period is according to the diversion procedure divided by the duration of each construction stage, meaningful diversion period, mainly is the cofferdam retaining water and guaran
您可能关注的文档
最近下载
- 2024年高中数学同步高分突破讲义(人教A版2019)1.1空间向量及其运算-(选择性必修第一册)(学生版+解析).docx VIP
- 青岛版四年级上册科学新教材全部实验.pdf VIP
- 儿童财商启蒙课课件.pptx
- 2025年职业技能鉴定考试(造林更新工)历年参考题库含答案详解(5卷).docx VIP
- 2025入团考试100题题库(含答案).docx VIP
- 2024年山西对口升学英语考试真题(含答案).pdf VIP
- 新北师大版三年级上册数学(全册)同步随堂练习一课一练.pdf VIP
- 《玫瑰少年》经典音乐曲谱.pdf VIP
- 军队文职思维导图:公共科目基础知识-非法.pdf VIP
- 第4课 用联系的观点看问题-【中职专用】2024年中职思想政治《哲学与人生》金牌课件(高教版2023·基础模块).pptx VIP
文档评论(0)