- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砌体砌筑工程的质量通病及防治(国外英文资料)
砌体砌筑工程的质量通病及防治(国外英文资料) Quality and control of masonry masonry construction Quality and control of masonry masonry construction Stone masonry (1) the brickwork is vertically connected Phenomenon: stone and stone masonry are connected in each layer, especially in the corner of the wall and in the stubble. Harm: reduces the integrity of the masonry. Reason analysis: (1) flaky, pebble masonry. The staggered groups more way of build by laying bricks or stones. But because of flaky, pebble block is irregular, ignored the overlapping of left and right, up and down, front and rear, QiFeng did not stagger, especially in the unchanged method of build by laying bricks or stones in the corner. (2) the stubble is not correct in the construction interval, and the stubble is not left in the wrong way, but the stubble is stubble. Control method: to strengthen the selection of the stone, and pay attention to the back-and-forth between the left and right sides of the rock. In the corner of the wall, the stone material used for the use of the stone material should be changed. Can select block in flaky, pebbles, form a whole, has a long straight, properly processed, or switch to stone, stone, make it suitable for Ding Shun stack build by laying bricks or stones or the needs of the group of build by laying bricks or stones. (2) two layers of inner lining Phenomenon: the cross-section of the section, which can be found in the outer layers of the masonry. This type of stone masonry has poor bearing capacity, poor stability and high level of horizontal thrust. This phenomenon is especially seen in stone masonry. Harm: the masonry stability is bad, easy to collapse. Reason analysis: (1) improper selection. The stone is too small and the stones are pressed too little, and the stones are not drawn, causing the cross-section to be repeated. (2) the masonry method is not correct. Especially the bridge type, the filling and the double wall method, which can easily cause two layers of inner lini
文档评论(0)