- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石灰土回填施工计划(国外英文资料)
石灰土回填施工方案(国外英文资料) Huo camp Shinkansen residential district big municipal project Calcareous soil backfill shi work party case The second project department of Beijing ted municipal engineering co., LTD On May 5, 2008 7 The first chapter is an overview of the project This project is located in the east small mouth town of huo camp in changping district. North li, nan chang, huang ping east road in the south, west to huang ping street, the east of the city in the east road, planning and construction land of about 37.16 hectares, with a total construction area of 687100 ㎡. To tie in with the construction of the residential area, and solve the traffic in and out, and meet the needs of the planning of municipal pipeline comprehensive arrangement, in December 2003, the official quoted the project plan design; And on February 5, 2004 by the rules committee organization of Beijing city of sarft, the municipal traffic management bureau, municipal bureau of parks and woods, employers and design units to road scheme for the project review, according to the result of the meeting and reply now, at the same time to tie in with the development and construction of the residential area to solve the rain sewage discharge and the requirement of reclaimed water use, improve the recycled water system in the region, this project outside article 5 the municipal road construction drawing design. The road of the east side road of the city of jiancai (huangping donglu ~ 10 li street) is 669.85 m. The road is 981.18 m on the east road of huangping road. · the road is 660.04 m on the east road of the huo camp. · the road is 209.41 m. · the road is 856.33 m on the north street of huo camp. In road construction, the current conditions of subgrade muddy soil, as confirmed by the owner, design and supervision of site decision, to dig for the part of the silt soil in filling, to meet the quality standard of roadbed, achieve the requirement of compactness, then fill in the material is graded gravel
文档评论(0)