由中央子午线惹起的投影变形题目标处理方法(国外英文资料).docVIP

由中央子午线惹起的投影变形题目标处理方法(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
由中央子午线惹起的投影变形题目标处理方法(国外英文资料)

由中央子午线引起的投影变形问题的解决方法(国外英文资料) So the engineering plane coordinate system adopts 1954 Beijing coordinate system, the central meridian longitude 121 ° 30 achievements should be adopted. ??????????? Changing with the authentication: after using two sets of tianbao R3 static machine and a set of tianbao R8 GPS receiver to known control points, a total of 4 sets of 3190 and 3194 using static observation method is used to detect the length, the synchronous observation time is more than 45 minutes, observation condition is good. Length of side calculated by observation and length are 0.016 meters, the relative accuracy is 1/132000, in accordance with the measurement of water transport engineering, for port engineering measurement scale is not less than the latter, its length deformation should not be more than 1/40000, so D GPS points 3190 and 3194 can be used as the project of plane control points. ??????????? 4 conclusion? ??????????? Long line engineering control network layont quantity bedding face is wide, except the data on analysis of reasonable, count, the determination of the coordinate system is the primary step of work, and determine the coordinate system of the key problem is the side length projection correction control, reasonable utilization of the zoning of this article discusses the projection method, the partition counter method, side length constraint will be well control long distances projection length deformation of engineering control network measurement values, offering reliable guarantee for engineering construction. The principle of determination of frame is: ??????????? 4.1 the project according to the diameter across the east long lines, the preferred by gauss first 3 ° orthomorphic projection plane rectangular coordinate system. ? ??????????? When the line is away from the central meridian (such as about 45km in the plain area), a gaussian conformal projection is applied to the rectangular coordinate system. ? ??????????? The network of contact

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档