- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土浇筑、振捣及养护注意事项(国外英文资料)
混凝土浇筑、振捣及养护注意事项(国外英文资料) General requirements for concrete casting and vibration The free fall of concrete from the head of the bucket should not exceed 2m, and the concrete measures must be taken when the height is more than 3m. 2, when the concrete should be segmented, layered continuous casting layer height should be according to the concrete supply capacity, a pouring quantity, concrete initial setting time, structural characteristics, reinforcement density considering the decision. The casting height is usually 1.25 times the length of the vibrator. The insertion type vibrator should be inserted fast, the insertion point should be evenly arranged, the order is carried out in order, and it is not left out. The moving spacing is no more than 1.5 times the vibratory radius (usually 30-40cm). The next layer should be inserted into the next layer, 5-10cm, to keep the two layers of concrete together. When vibrating, the vibratory rod must not touch the embedded parts and the template. The distance between the surface vibrator (or the plate vibrator) should be guaranteed to cover the edge of the vibrators plate. 4, concrete shall be carried out continuously, such as must be intermittent, the intermittent time should be shortened as far as possible, and should be in the first layer of concrete initial setting before the first layer of concrete pouring is completed. The maximum duration of the interval shall be determined according to the concrete conditions of the concrete, the temperature and the concrete conditions of the concrete, and generally more than 2h should be handled according to the construction seam. When concrete condenses time is less than 2h, the initial setting time of concrete should be executed. 5 should be often observe template, pouring concrete, steel bar, reserved holes and embedded parts and steel dowel for mobile, deformation or congestion, found that the problem should be dealt with immediately, and should be in already pouring concrete initia
您可能关注的文档
最近下载
- 并网光伏电站项目工程现场电气二次施工方案.doc
- 英语新课标背景下:非纸笔测试在小学英语期末评价中的实践研究.pdf VIP
- 液体伤口敷料产品技术要求标准2023版.docx VIP
- 股市实战绝技汇总篇(精华).doc VIP
- 历年行情的十大牛股.doc VIP
- 安徽省六校联考暨安徽六校教育研究会2026届高三入学素质检测-物理试卷答案.docx VIP
- 基于Ansys CFX的风扇叶片双向流固耦合分析.docx VIP
- (高清版)DB1307∕T 334-2020 蛋鸡无抗养殖技术规范.pdf VIP
- 中小学教育班班通系统校级解决方案.doc VIP
- 涉税检举奖励制度的运行问题...于68份裁判文书的考察分析_金超.pdf VIP
文档评论(0)