- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
消防箱体抹灰交底-中大院(国外英文资料)
消防箱体抹灰交底-中大院(国外英文资料) Technical background record Page number: 1, a total of 5 pages The name of the project Project of dalian senior manager institute of China Construction unit China construction eighth engineering bureau co., LTD Division engineering, site and scope The main structure of the property is four floors 1-8 / a-m Date of disclosure On July 3, 2011 The name of the division project (operation) Concrete pouring Content of the disclosure: First, preparation for construction 1, construction equipment Rake, broom, white line, aluminum alloy, spade, spade, concrete car pump, vibrator, distribution box, water pump, etc. 2, technical preparation, Application: 1) concrete pouring concrete stick, and concrete supply unit for ready-mixed concrete in advance orders and water application, the content of orders: concrete strength grade, volume, slump, the initial setting and final setting time whether to add antifreeze and pouring time, etc. All machine tools should be inspected before concreting concrete, and equipped with professional technicians to repair them at any time. Avoid machine failure in construction, cause unnecessary shutdown. During the concrete pouring period, the water, electricity and lighting shall not be interrupted. In order to prepare for the temporary shutdown, there should be a certain amount of manual stirring and vibratory tools in front of the scene in case of accidental construction. Prepare the necessary plastic sheeting and insulation materials according to the construction plan. 3, operation conditions, 1) the rebar inspection and the pre-examination of the template are finished. The frame of the pump and pump pipe has been set up. 3) vibrates the equipment to debug normal and has a certain amount of vibrates. 4) the contact signal for the feeding and casting points is ready. The Labour arrangement is in place and the list has been reported. Coordinate with the urban management department to ensure the smooth construction of concrete.
文档评论(0)