施工进度包管办法(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工进度包管办法(国外英文资料)

施工进度保证措施(国外英文资料) Construction progress guarantee measures The construction progress assurance measures include five aspects such as organizational measures, technical measures, contract measures, management measures and logistics measures. 3.1 organizational measures The organizational coordination of construction projects is an effective measure to achieve the progress control. The competent project department of 3.1.1 shall be responsible for the implementation of management positions. To establish the responsibility of the various types of workers, to control the process, quality and safety of the project, and to conduct the inspection. 3.1.2 control the construction schedule to the management priority of the company. Company leaders and departments concerned, go all out, around the project, every ten-day of funds, supplies, equipment, labor, technology, quality management and construction schedule for an inspection and coordination, make full support, to ensure that meet the needs of the construction schedule control. 3.1.3 establish engineering coordinate system, strengthen overall contracting and professional subcontractors cooperation and coordination, timely exchange information with relevant unit, grasp the dynamic construction, coordinating the work among internal each major type of work, pay attention to the follow-up process of preparation, the transition between decorate a process, in a timely manner to solve the various problems occurred in construction. The professional subcontracting unit shall formulate and implement the work plan according to the construction schedule of the general contractor, and put into practice after the comprehensive balance of the overall contracting unit and the confirmation. 3.1.4 to strengthen on-site construction management and to implement the responsibility, power and interest. To strictly control the quality of construction and avoid rework. Within the project department, the appraisal system shall be conducted withi

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档