- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工进度包管办法(国外英文资料)
施工进度保证措施(国外英文资料)
Construction progress guarantee measures
The construction progress assurance measures include five aspects such as organizational measures, technical measures, contract measures, management measures and logistics measures.
3.1 organizational measures
The organizational coordination of construction projects is an effective measure to achieve the progress control.
The competent project department of 3.1.1 shall be responsible for the implementation of management positions. To establish the responsibility of the various types of workers, to control the process, quality and safety of the project, and to conduct the inspection.
3.1.2 control the construction schedule to the management priority of the company. Company leaders and departments concerned, go all out, around the project, every ten-day of funds, supplies, equipment, labor, technology, quality management and construction schedule for an inspection and coordination, make full support, to ensure that meet the needs of the construction schedule control.
3.1.3 establish engineering coordinate system, strengthen overall contracting and professional subcontractors cooperation and coordination, timely exchange information with relevant unit, grasp the dynamic construction, coordinating the work among internal each major type of work, pay attention to the follow-up process of preparation, the transition between decorate a process, in a timely manner to solve the various problems occurred in construction. The professional subcontracting unit shall formulate and implement the work plan according to the construction schedule of the general contractor, and put into practice after the comprehensive balance of the overall contracting unit and the confirmation.
3.1.4 to strengthen on-site construction management and to implement the responsibility, power and interest. To strictly control the quality of construction and avoid rework. Within the project department, the appraisal system shall be conducted withi
您可能关注的文档
- 挡车器装置设计(国外英文资料).doc
- 挡水条技巧交底记录(国外英文资料).doc
- 捞渣机任务道理及结构介绍(国外英文资料).doc
- 据时代周报;文中多半人物为化名(国外英文资料).doc
- 捷达2V发念头水温高的实际基础(国外英文资料).doc
- 挡烟垂壁应用指南(国外英文资料).doc
- 掉业领导希冀调盘问卷(国外英文资料).doc
- 掉落蜡法周详锻造(国外英文资料).doc
- 掌管人掌管词(国外英文资料).doc
- 排土场卸料区(国外英文资料).doc
- Abaqus在平分式缸体主轴承座强度分析中的应用.docx
- CFX&Fluent and Turbo Tools 2020 R2功能更新_中文版.docx
- Discovery AIM与Ansys Fluent联合设计优化蒸发冷却过程.docx
- Abaqus在软土大型盾构工作井稳定性分析中的应用.docx
- ANSOF高级培训班教材.docx
- GB51022-2015 门式刚架轻型房屋钢结构技术规范.docx
- FEKO应用_复合材料目标体RCS.docx
- 心理测量-症状自评量表SCL-90.docx
- CTAB 表面活性剂湍流传热实验与模拟计算.docx
- CFD-DEM方法在气泡下扫与冰区船方面应用介绍_哈工程.docx
文档评论(0)