- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
敷设方法的英文缩写(国外英文资料)
敷设方式的英文缩写(国外英文资料) The 2008-7-14 21:52 The best answer Here is my collection of electrical design drawings that are commonly used for wiring: SR: lay along the steel wire slot BE: run along the roof or across the roof CLE: lay along the column or across the column WE: lay the wall along the wall CE: lay on the ceiling or ceiling ACE: its built into the ceiling of a person BC: dark lay in the beam CLC: hidden in the column WC: dark lay in the wall CC: dark lay in the ceiling ACC: dark lay in a ceiling that cannot be entered FC: dark lay in the ground SCE: the top of the ceiling is laid, and the metal tube is used One, the wire tube says SC - welded steel pipe MT - wire and tube PC - PVC hard plastic tube Fpc-fire resistant plastic hard pipe CT - bridge MR - metal trough M - wire CP - metal hose PR - plastic trough RC - galvanized steel pipe Two, the way the wire is laid out The DB - buried TC - in cable trench BC - dark applied in the beam CLC - dark applied in the column WC - dark on the wall CE - lay on the roof of the sky CC - dark on the roof of the sky SCE - ceiling inside the ceiling F - floor and ground floor The SR - along the wire BE - along the roof, beam WE - Ming fu along the wall Three, lamp installation mode of representation CS - chain hanging DS - hanger W - wall installation C - top absorption R - embedded S - bracket CL - post Along the steel wire slot: SR Along the roof or across the roof: BE Column or cross column: CLE Wear welding steel pipe laying: SC Wear wire tube for installation: MT Wear hard plastic pipe to make: PC Wear flame-retardant semi-rigid PVC pipe laying: FPC Cable bridge shelf: CT The metal trough lay: MR Plastic wire groove: PR Use wire rope: M Wear PVC plastic corrugated wire tube for installation: KPC Wear metal hose: CP Directly buried: DB Cable trench: TC Marking of the position of the conductor Line or girder (roof) lay: AB Dark applied to beam: BC Line or span: AC Dark lay in the column: CLC Lay the walls: WS Dark lay in th
文档评论(0)