- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
平安保通培训内容(国外英文资料)
安全保通培训内容(国外英文资料)
Use the construction sidewalk on the right side of the railway line. No impact on ramp traffic.
2.2, construction water
The construction used in the construction of the lower structure of 355 ~ 363 # piers is used to meet the construction needs of the original machine well in the range of the ramp. 364 # and 365 # piers use the lower part of the ramp to introduce water into the construction.
Construction electricity
366 # pier construction USES the peripheral construction power for construction; 364 # ~ 365 # pier foundation construction, power distribution cabinets, are installed near the 366 # pier through underground pipeline will be introduced to the construction of electricity 364 # ~ 365 # pier, power distribution cabinets, are installed near the 365 # pier by power distribution cabinet is introduced into the ShiGongDian again; 355 # ~ 363 # pier foundation construction, electricity by 363 # ~ 364 # pier Qi County Beijing between Hong Kong and Macao highway interchange ramp culvert will be introduced to the lead to 365 # pier construction electricity 355 # ~ 363 # pier construction area.
Third, construction approach protection measures
1, all vehicles entering the ramp construction must be under the bao tong member allows, command, permission of the member that do not have bao tong, Hong Kong and Macao expressway interchange ramp construction vehicles are not allowed to enter Beijing. The construction vehicles in and out of the ramp must be cleaned up and prevented from polluting the highways.
All the vehicles entering the ramp are not more than 20km/h.
All construction vehicles in and out of the ramp shall be given a prescribed license plate according to the requirements of the road administration.
All construction vehicles must be carried out in accordance with the requirements of the road administration and ensure that the vehicles are not lost.
5, in a setting high speed ramp crossings bao tong, bao tong radio contact by radio, equipped w