大工13春《土木工程概论》在线测试3(国外英文资料)
大工13春《土木工程概论》在线测试3(国外英文资料)
13 spring introduction to civil engineering online test 3
1. At room temperature, using the appropriate materials cover concrete, wet, dry wind prevention, heat preservation and take water anti-freezing measures such as conducted by the maintenance is ().
A. hot curing
Standard curing
C. cold curing
Natural curing
4 points: 4
According to soil (), soil can be divided into water and water.
Apparent density
The water absorption of B.
Coefficient of penetration
Relative density
4 points: 4
The following is a statement about the double codename network graph, and the error is ().
A. arrow is for work
Usually the work name is written on the top (or left) of the arrow.
C. write the duration of the work under the arrow (or on the right)
D. In the network diagram, a connection with a double arrow is allowed
4 points: 4
The vertical slope of the unsupported structure is not more than () in the solid and medium-thick sand and gravel soil.
A. 1.00
B. 1.25
C. 1.50
D. 2.00
A full score: 4
The height is 5m, the horizontal projection width is 3m, and the slope coefficient of the slope is ().
A. 0.6
B. 1.67
C. 0.8
D. 1.25
A full score: 4
The concrete shall be cast before (before) from the stirring site to the pouring site.
A. the false setting
B. initial setting
C. final set
D. hardening
4 points: 4
In the classification of soil engineering, the solidity coefficient is 0.5 ~ 0.6, which is also called ().
A. the soft soil
B. common soil
C. hard soil
D. the gravel
A full score: 4
The ratio of concrete to the quality of various materials, or the proportion of materials used in concrete.
A. per liter
B. a tonne
Per cubic meter
D. can
4 points: 4
The following statement on the pile foundation is wrong ().
A. load capacity
The aseismic performance is good
Small settlement
D. Is a shallow foundation
4 points: 4
In the following network plan, it is () that the time expression of the network plan is divided into ().
A. unit engineering network plan
B. the control
您可能关注的文档
最近下载
- 桥牌入门-课件(PPT演示稿).ppt
- 教科版(2017)小学科学四年级上册各单元测试练习及答案(附期中期末练习).pdf
- 博雅汉语初级起步篇第15课说课材料.ppt
- 东风本田-思威(CR-V)-产品使用说明书-两驱CR-V豪华版Vti-DHW6453R3CSD-思威(CR-V)用户手册.pdf
- 云南名扬药业有限公司的营运能力分析.doc VIP
- 种牙得牙--口腔种植学.pptx
- 图解:种牙与镶牙的区别,缺牙的赶紧看.pdf VIP
- 萃取盐酸洗涤液的锡铟分离的方法及其应用.pdf VIP
- 传统节日剧本.doc
- EMERSON艾默生 Guide OpenEnterprise OPC Server Reference Guide说明书用户手册.pdf
文档评论(0)