土方回填请求(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方回填请求(国外英文资料)

土方回填要求(国外英文资料) Land reclamation technical requirements Abstract; (1) artificial return The base of the pit (trough); Before filling the soil, it should clean up the ground hole and the garbage in the bottom of the ditch. The backfill of the groove must be cleaned up to the base level, and the loose dirt, mortar and pebbles will be cleaned up. Check the soil; If the water content of the reclaimed land is in the control range, such as the high water content, it can be used for the measures such as turning loose, cooling or blending into dry soil. If the moisture content of the backfill soil is low, the measures such as sprinkling water and moistening can be adopted. 3 layering and raking; The reclaimed land should be spread out and rammed. The thickness of each layer should be determined according to the soil quality, the requirement of the compactness and the performance of the machine. The average frog rammer has a thickness of 200 ~ 250mm per layer. Manual tamping no more than 150mm. Each layer is spread out and then rakes. To rammer the chamber of secrets; (1) the backfill soil rammed at least three times. The rammer should be rammed, rammed and intersected. And the so-called tamping method, which is strictly forbidden to water the soil. (2) when the deep shallow pit is connected, the deep foundation pit should be filled first, and then the shallow base hanger will be filled with the shallow foundation pit. If it is necessary to consolidate, the contact should be in a trapezoid and not to be used for tamping. The upper and lower gaps are not less than 1.0 m (3) the backfill of the pit shall be carried out at the same time as it is opposite or around. There is not too much difference between the two sides of the foundation wall, so as not to push the wall out. Longer trench walls should be supported by internal measures. (4) to refill the heart and trench, to prevent the displacement of the Central Line of the pipe or damage the pipe, and the application of artifi

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档