华厦监理测验题(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
华厦监理测验题(国外英文资料)

华厦监理考试题(国外英文资料) Shanxi huayu building project supervision co., LTD Single topic selection: The technical director of the company shall be responsible for the technical guidance of the project supervision department, and the approval shall be made (B). A. supervise the planning and supervision of the project b. supervision plan and quality assessment report C. quality assessment report and supervising work summarize D. Supervision planning and supervision details The supervision of the monthly report shall be compiled, signed and stamped by (A), and shall be submitted to the construction unit and the companys engineering supervision department before the 5th of the second month. A: the chief engineer B. professional supervision engineer C. inspector D. documenter The director shall conduct regular examination of the project supervisors, each (B) once. A. half A year The base of a project shall be taken up to 280 piles, and the number of carrying capacity shall be (B) root. A. two b. one c. five d. seven 5, the description of the building curtain wall is correct (D?). ? The building curtain wall is the construction perimeter protection structure which bears the load and function of the main structure The stone curtain wall should bear the load and function of the main structure, and the glass curtain wall should not bear the load and function of the main structure C. there is no metal frame, and the building structure that directly hangs the stone panel directly from the concrete wall directly through the pre-buried and the metal wall is not a construction curtain wall The construction curtain wall is not the structure of the main structure and the structure of the structure has certain displacement capability A concrete beam with a span of 6m, which can be dismantled when the concrete strength reaches the design strength standard (C). A, 50% B, 60% C, 75% D, 100% 7, when the template support column height more than (B) m, should be the pillar circumferential outer a

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档