- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
偏爱观测与回心改正(国外英文资料)
偏心观测与归心改正(国外英文资料)
Eccentric observation and correction for centering § 3.7
Triangulation point point at the center of the monument signs (general habit says monument center), that is, between triangle and the coordinates of the triangle direction and side length are the center of monument of triangle points as the basis, therefore, when the observation requirements instrument center, take the cylinder and the monument center is located in the same vertical line, known as the three heart.
Will be observation instruments mounted on a tripod, the pendant or about to can make the instrument in the center of the monument and center on the same vertical line, such as a theodolite in this article include the observation platform (also known as instruments), you must first along the vertical projection at the center of the monument to the observation platform, and then put the instrument on the projection point observation platform in the center of the monument, the instrument center and stone in the same vertical, but in fact often cannot do it strictly. Sometimes monument center on the observation of the projection point on the edge of the observatory, even on the outside of the observatory, at this time in order to instruments stability and the safety of the observation, still put the instrument in the middle of the observatory, which is instrument center off through the center of the monument vertical; Sometimes in order to meet the demands of observation, such as signals of sculling column blocked a sighting direction, instrument would also have to pass a monument deviates from the center of vertical, this deviation is called station eccentric. In order to calculate the result of the eccentric observation to the center of the test station, the number of the correction of the site must be added.
When making the buried stone, though as far as possible put sighting cylinder center and stone in the same vertical, but as a result of observation and buried building work to
您可能关注的文档
最近下载
- 人教版初中英语课标版 九年级第十单元Section A 3a—3c(21张).pptx
- 中小企业融资-全套PPT课件.pptx
- 2024年麻醉、精神药品规范化管理与使用培训考核有答案.docx
- 【基恩士】LR-W500(C) 使用说明书 (简体中文).pdf
- 11第十一章-通货膨胀与通货紧缩(货币金融学(蒋先玲编著)第3版ppt课件可编辑).pptx
- 人美版八年级上册美术教案.pdf VIP
- 工科基础物理学(下册)课后习题答案董科,周雨青,张玉萍高等教育出版社.pdf
- Unit 6 A Day in the Life (Period 1)课件-人教版英语七年级上册(2024).pptx VIP
- 光伏支架及光伏组件安装工程施工方案.docx VIP
- 曲安奈德局部封闭治疗.pptx VIP
文档评论(0)