一级建筑师收集计划(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
一级建筑师收集计划(国外英文资料)

一级建造师网络计划(国外英文资料) The concept and calculation of total jet lag. Three, six time parameters and the calculation procedure Four, the time parameter is the main calculation formula Application of the principle of labor Claims (contract claims and network planning) 7, common claims time. Engineering change 9, actual construction period The period of reward and punishment Candidates are doing primary constructor double code network chart drawing questions, must grasp the drawing of the eight rules, such as: double code network diagram must be determined correctly express has logical relationship; In the double codename network diagram, there is no link between the nodes and the arrows. In the double codename network diagram, there is no arrow or no arrows. ???? Double code network drawing rules: A double code network diagram must correctly express the identified logical relationship. No loops are allowed in the double code network diagram. The so-called loop circuit is the line that starts from one of the nodes in the network diagram and follows the arrow line back to the original starting line. In a double codename network diagram, there cannot be a two-way arrow or no arrows between nodes. In the double codename network diagram, there is no arrow or no arrow at the end of the arrow. 5, when some nodes of double code network diagram of multiple arrows line or more introverted outgoing line, in order to make the graphics is concise, can use method of bus bar drawing (but should satisfy a job with an arrow line and the corresponding pair of nodes). When drawing a network diagram, the arrow line should not cross. When the crossing is unavoidable, the bridge method or the point method is available. 7, the double code network diagram should be only a start node and a destination node (with the exception of multiobjective network planning), and all the other nodes are should be the intermediate nodes. The double codename network diagram should be organized and reasonable. ??

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档