《路桥工程施工组织技能实训》义务书(国外英文资料).doc

《路桥工程施工组织技能实训》义务书(国外英文资料).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《路桥工程施工组织技能实训》义务书(国外英文资料)

《路桥工程施工组织技能实训》任务书(国外英文资料) The work of the technical training of road bridge construction organization Applicable major: road bridge major Design objectives: Through the design, make the students master the ways and means in construction organization and management, master the crossing the figure and the preparation of double code time scale network diagram, engaged in construction project management of the preliminary ability, to achieve the requirement of the curriculum standard. Design conditions: 1, the engineering general situation The hl-ls-s1 contract section of a highway construction project, the starting pile is XDK0 + 000, and the end point is XDK4 + 000, which is located in the area of baotan town of lianshui county, which is 4km long. The width of the roadbed is 26m, the central dividing bandwidth is 2m, the lane width is 2 by 7.5 m, the road width is 2 x 0.75 m, the shoulder width 2 x 3.75 m (the hard shoulder 3 m, the dirt road shoulder 0.75 m). The deadline is 11 months. The start date is November 2008 and the completion date is September 2009. Main project quantity Number of projects The excavation was 6.103 Fill the earth with 222.782 The concrete prefabricated block m3 1241 Cement lime fly ash stabilized base square meters 105253 Lime fly ash stabilized the base square meter square meter 98765 Asphalt concrete square meter 92893 The reinforced concrete round tube is 1225.5 The reinforced concrete cover is 27.4 3, the road map Design content and depth (1) to classify the construction period of the project, determine the number of construction process, and determine the tempo of the flow of water in the construction process according to the working period. (2) to compile a dual-code network map according to the relationship between the work. Calculate the two codename network diagram nodes first and later. The network diagram is introduced when the network graph is introduced. (3) arrange the floor plan according to the conditions of the scene. Produ

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档