网站大量收购独家精品文档,联系QQ:2885784924

图纸注解翻译.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
图纸注解翻译

图纸标注译文(顺序为从左至右) 预制厂位置及平面布置图注解 预制厂位置及平面布置详见下图: The location and layout of prefabrication plants is shown below: 205 国道:No. 205 highway 长芦公路:Changlu road 四建扬子项目经理部:TFCC Yangtze project management department 聚酯厂:Polyester Plant 新大化工厂:Xingda Chemical Plant 新建长芦预制厂:the newly-built Changlu Prefabrication Plant 乙烯路:Ethylene Road 长芦预制厂平面布置图注解 图例:Legend 原有道路:existing road 电线杆(原有):wire pole 新建临时道路:newly-built temporary road 电缆及配电箱:cable and distribution box 供水线及水阀:water supplying pipe and valve 轨道:rail 排水沟:drainage ditch 照明灯:lighting lamps 厕所:W.C. 灯塔:lighthouse 厂外路:Changwai Road 阀门试压站:valve pressure testing station 阀门存放区:valve stock area 材料摆放区:material laydown 配件库:fitting storehouse 供应办公室:supply office 材料摆放区:material laydown 抛丸机:shot-blasting machine 钢材抛丸区:steel shot-blasting processing area 塔吊:tower crane 变压器:transformer 防腐厂房:anti-corrosion workshop 防腐设备:anti-corrosion equipment 下料组对区:material cutting and assembly area 隔离栏:fence 组对焊接区:assembly and welding area C型吊:C-type gantry crane 滚板:plate rolling machine 钻床:driller 刨床:planing machine 剪板:cutting machine 机械加工区:mechanical processing area 露天预制区:outdoor prefabrication area 成品摆放区:finished products laydown 办公室:office 建北:construction north 说明:notes: 1.预制厂为梯形,总面积约40000平方米,位于长芦公司路北侧,西临聚酯厂。 1. The contour of the prefabrication is trapezoid, with total area 40,000 m2, located in north of Changlu Road, near Polyester Plant in the west. 2.预制厂内建预制厂房12米X120米彩板结构一座,双层轻型结构办公室两座,宽4.8米、长24米、高5.5米。 2. In the prefabrication plant, there established one prefabrication shop, 12m by 120m, in color board structure; two two-storey offices, 4.8m by 24m by 5.5m, in light material structure. 3.厂内从高压线引入电源,并安装两台800KVA变压器,埋设低压电缆至各个配电箱。 The Plant get power from outside high-voltage electric source, equipped with two 800KVA transformers, the low-voltage cables is embedded and connected with distribution boxes. 4.供应库区建6座轻型结构库房,规格8米X20米,阀门试压站1座6米X30米轻型结构。 In the supply area, there are 6 warehouse (8m x 20m), 1 valve pressure testing station(6m x 30m), bo

文档评论(0)

yan698698 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档