- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
锤击成桩重锤低击轻锤重击桩头冲击力贯入度
M arineGeoresources Geotechnology Tocitethisarticle: Ji-ChengW ang,JianlinYu,ShiguoM a XiaonanGong(2015):HammersImpactForceonPileand Piles Penetration,M arineGeoresources Geotechnology,DOI:10.1080/1064119X.2015.1016637 Tolinktothisarticle:/10.1080/1064119X.2015.1016637 Acceptedauthorversionpostedonline:28M ay2015. Hammer’s Impact Force on Pile and Pile’s Penetration Ji-Cheng Wang Institute of Architectural Engineering, Ningbo University of Technology, Ningbo, Zhejiang, China Jianlin Yu College of Civil Engineering and Architecture, Zhejiang University, Hangzhou, China Ma Shiguo Ningbo Urban Construction Investment Holding Company Limited, Ningbo, Zhejiang, China Xiaonan Gong College of Civil Engineering and Architecture, Zhejiang University, Hangzhou, China Address correspondence to Ji-Cheng Wang, No. 201, Fenghua Road, Jiangbei District, Ningbo, Zhejiang 315211, China. E-mail: wjc1818@ Color versions of one or more of the figures in the article can be found online at /wifa. Abstract Methods of energy and momentum conservation, vibration theories, and model tests are employed to research into impact force of hammer on pile and pile’s penetration Analytical formula of impact force of hammer on pile is obtained. Comparison of results from the three methods finds that the analytical formula proposed by this paper conforms well to practical situations. Research results 1 show that, If hammer’s impact energy remains unchanged, Penetration increases with the increase of hammer weight and cushion stiffness; Impact force the pile head receives degrades with the increase of hammer weight but increases with the increase of cushion stiffness; Impact time decreases with the increase of cushion stiffness but increases with the increase of hammer weight. Model test shows that, compared with cotton cloth cushion, elastic cushion’s advantages lie in that relatively small pile head impact force can achieve big pile penetration, and cotton cloth is gradually compacted with the in
您可能关注的文档
最近下载
- 金堆城汝阳石柱沟水库工程建设监理工作报告.pdf VIP
- 教育部产学合作协同育人教学内容和课程体系改革项目申报书—以项目为牵引的机器人系统与开发实践课程教学设计.docx VIP
- 2025年新高考1卷(新课标Ⅰ卷)语文试卷(含标准答案).docx
- 《恋爱的犀牛》话剧剧本.doc VIP
- 屋顶改造方案.docx VIP
- 部编小学语文单元作业设计四年级上册第四单元 3.pdf VIP
- Arduino智能小车避障导航设计.docx VIP
- 县委书记在乡村振兴战略实绩考核调度会上的讲话.docx VIP
- 第11课 整理信息资源 教案 义务教育人教版信息科技三年级全一册.docx VIP
- 苏S01-2012给水排水图集规范图集.docx VIP
文档评论(0)