- 1、本文档共71页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
上半合肥市事业单位招聘职位表汇总
华图网校: HYPERLINK
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to
您可能关注的文档
- 一级建造师市政公用工程实务考试试卷及答案.docx
- 一级建造师市政工程真题及答案完整版.docx
- 【考前三个月】高考生物人教通用二轮专题突破练:专题现代生物科技专题.doc
- 一级建造师市政工程考试真题及答案.doc
- 一级建造师市政公用工程真题及答案.doc
- 一级建造师建筑工程实务模拟试题四.doc
- 一级建造师建设工程.doc
- 一级建造师建筑工程实务真题案例.doc
- 一级建造师建设工程法规与相关知识考试真题及答案.doc
- 一级建造师建筑工程考试大纲word版本.doc
- 携程产品营销经理岗面试题库参考答案和答题要点.docx
- 携程产品经理岗面试题库参考答案和答题要点.docx
- 携程供应链管理专员岗面试题库参考答案和答题要点.docx
- 携程交易数据分析师岗面试题库参考答案和答题要点.docx
- 携程公共关系专员岗面试题库参考答案和答题要点.docx
- 携程内部培训专员岗面试题库参考答案和答题要点.docx
- 福建省福州市2023-2024学年高二上学期期末测试英语试卷(含答案).pdf
- 携程人力资源专员岗面试题库参考答案和答题要点.docx
- 福建省三明市2023-2024学年高二上学期期末测试英语试卷(含答案).docx
- 福建省三明市2023-2024学年高二上学期期末测试英语试卷(含答案).pdf
最近下载
- 火灾事故应急预案报警跟接警处置程序.doc
- 二年级期中考试家长会PPT.pptx
- 工程力学资料--工程力学教案.pdf VIP
- 虹吸排水施工合同(签订).doc
- 高级技工学校《金属材料与热处理》教案 (中职教育).pdf VIP
- 2019款广汽本田奥德赛混动版_汽车使用手册用户操作图解驾驶指南车主车辆说明书电子版.pdf
- 基于滑模观测器的控制系统研究.pdf VIP
- DB44∕T 1023-2012 企业管理咨询和培训机构资质等级评审规程.docx
- 面向半导体设备的Interface A通信方法研究.pdf
- 高中英语_Click For A Friend教学设计学情分析教材分析课后反思.doc
文档评论(0)