- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
扬巴污水提升泵站压密注浆施工组织设计方案
污水提升泵站压密注浆施工方案
前言Preface
污水提升泵站压密注浆主要针对其基坑底板下部的约1.8m厚的粉土,因其底板呈阶梯部,部份土体滑动,造成部份底板与其下部粉土的分离,而形成空洞,目前通过现场勘察,因破坏处为16×3×1.8m。因而要求采用注浆方式进行土体加固。This plan is mainly aimed at about 1.8m THK powder soil in the bottom slab of foundation pit. As the bottom slab is in a step and part of the soil is slided, some slabs are separated from the powder soil. So the hollows turn up. After the site investigation, as the broken area is 16*3*1.8m, method of grouting should be adopted for the soil strengthening.
压密注浆方法Methodology for Compaction and Grouting
该工程基坑底板现已浇注成功,依据现场的破坏程度及以往的施工经验,先通过人工方式在底板开孔,然后依据水灰比0.5~0.6的方案进行搅拌水泥浆,再将搅拌均匀的水泥浆用机械方式输入孔洞中,已达到加固地基土为目的。The bottom slab in foundation pit has been successfully placed. According to the damage degree and our construction experience, firstly we will make hole by manpower, secondly mix cement mortar in a water cement ratio of 0.5~0.6. Then cement mortar will be conveyed into holes by machine to meet the requirement.
施工淮备Construction Preparation
设置制浆站、加浆站尽量减少移动次数。Establish the mortar process station and adding station to minimize the times of removal.
设备调试,检查设备运行的情况。Equipment commissioning. And check the running status for equipments.
备料、搭建水泥存放点。Material preparation. And build the storage for cement.
施工计划Construction Plan
施工设备:水泥浆压力泵一台;泥浆搅拌桶一台;储浆桶一只;注浆杆一根;注浆管50m。Construction Equipments: One cement mortar pressure pump. One bucket for cement mortar mixing. One bucket for storage. One pole for mortar filling and 50m conduit.
人员组织:施工现场在施工项目经理部的领导下,另配压密注浆现场施工负责人1人,熟练压密注浆工6人。Staff Organization: All site staff shall be guided by P.M., with one site construction supervisor and 6 competent and experienced workers for compaction and grouting.
施工技术要求Construction Technical Requirements
1、 技术要求:Technical Requirements
因施工地块现已浇注混凝土底板,固采用风镐进行人工开孔,孔距为2.0m~1.5m,呈梅花形布孔,这样有利于浆液充填。As the site has been placed with concrete, holes will be made by manpower with air pick. These holes will be in a plum blossom shape, with clearance of 2.0m~1.5m to facilitat
您可能关注的文档
最近下载
- 专题5.3主视图、左视图、俯视图【七大题型】(举一反三)(苏科版)(原卷版+解析).docx VIP
- 系统稳定性优化方案.docx VIP
- 飞行器制造工程专业职业生涯规划书.pptx
- 东北大学大学物理课件-第八章电磁感应电磁场.ppt VIP
- 电大一网一《Java语言程序设计》山东开放大学形成性考核一-100分.doc VIP
- 美团_W-市场前景及投资研究报告:本地生活领先者,组织改革,AI赋能,饿了么.pdf
- 思想道德与法治第三章.pptx VIP
- 核物理与辐射安全智慧树知到期末考试答案章节答案2024年哈尔滨工程大学.docx
- Unit 9考点梳理-九年级英语全一册(人教版).docx
- 2015汽车nvh技术.ppt VIP
文档评论(0)