网站大量收购独家精品文档,联系QQ:2885784924

Figure1.PetrobrasGASTAU.PDF

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Figure1.PetrobrasGASTAU.PDF

Figure 1. Petrobras’ GASTAU pipeline spans 97 km, running from the Caraguatatuba Gas Treatment Plant to the Taubaté Custody Transfer Station and S?o José dos Campos Refinery to transport natural gas produced in Brazil’s Mexilh?o gas field. 2 Scott Funderburk, Lincoln Electric, USA, describes how a Brazil pipeline project overcame timetable and rejection rate challenges using heavy- duty GMAW consumables and an automated welding process. Automated welding on GASTAU razilian integrated energy supplier Mexilh?o gas field, located in the offshore Petrobras was working on its Santos Basin. It is expected to carry up to GASTAU project when production 15 million m3/d of gas and yield 20 000 bpd Bslowed due to a high rejection rate of natural gas condensate. The project is of on its welds, which was affecting the overall strategic importance to Brazil in that it will project schedule. It quickly became apparent feed the industrial, domestic and automobile that automated welding would be needed to natural gas consumption in the country’s complete the job on time to open in 2011. major metropolitan areas. Its latest expansion in the pipeline market, The project the GASTAU project, runs through a highly Running 97 km from the Caraguatatuba Gas developed region that includes industrial Treatment Plant to the Taubaté Custody plants, large metropolitan areas of more Transfer Station and S?o José dos Campos than two million inhabitants, large farms, a

文档评论(0)

tangtianxu1 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档