- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
轻松生活一点通:小窍门大便利全文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe. carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
最近下载
- 青鸟消防JBF-21SF-C系列主机说明书.pdf
- HT200电气原理图设计1.doc VIP
- Q/GDW+13053.25—2018++35-750并联电容器成套采购标准(第25部分:110(66)kV变电站10kV-6000kvar-12%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- Q/GDW+13053.27—2018++35-750并联电容器成套采购标准(第27部分:220kV变电站10kV-8000kvar-12%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- Q/GDW+13053.37—2018++35-750并联电容器成套采购标准(第37部分:330kV变电站35kV-40Mvar-12%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- Q/GDW+13053.38—2018++35-750并联电容器成套采购标准(第38部分:500kV变电站35kV-60Mvar-5%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- 柴油机发电机调试记录表格.docx VIP
- Q/GDW+13053.39—2018++35-750并联电容器成套采购标准(第39部分:500kV变电站35kV-60Mvar-12%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- Q/GDW+13053.41—2018++35-750并联电容器成套采购标准(第41部分:220kV变电站66kV-10Mvar-12%电抗率框架式并联电容器成套装置专用技术规范).pdf VIP
- 人教版小学三年级下册数学应用题专项练习题100道.docx VIP
文档评论(0)