- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 复习指导书勘误.doc
- 夏天来了冷菜更受欢迎 渠道网告诉您道创新时尚冷菜的做法.docx
- 夕会集中训练素材:寿险的意义和功用小故事.doc
- 复旦大学校长杨玉良毕业致辞.doc
- 基于单片机的火灾报警系统最终郭超.doc
- 外文翻译朱海锋.doc
- 外文简历日常词汇 A.doc
- 外贸个月经验引自 福步外贸论坛.docx
- 外贸人员攻克模具外贸沟通大碍!.doc
- 外籍团队主掌 步步高大卖场蜕变.docx
- 2025年人教版中考生物总复习第二部分专项突破专项三生物与环境.pptx
- 2025年人教版中考生物总复习课标新理念题二项目式学习.pptx
- 2025年人教版中考生物总复习第三部分考点培优七年级上册第三单元生物圈中的绿色植物第四章第五章第六章.pptx
- 2025年人教版中考生物总复习考点精讲七年级上册难点突破1食物网与物质循环.pptx
- 2025年道德与法治中考总复习第二部分考点培优八年级下册第三单元人民当家作主第五课我国的政治和经济制度.pptx
- 2025年人教版中考英语总复习考点精讲十一 八年级(下)Units 1-2.docx
- 2025年人教版中考英语总复习考点精讲十五 八年级(下)Units 9-10.docx
- 2025年中考道德与法治总复习第一部分考点精讲九年级下册第三单元走向未来的少年.pptx
- 2025年人教版中考生物总复习考点精讲八年级上册第五单元生物圈中的其他生物第四章细菌和真菌 第五章病毒.pptx
- 2025年中考道德与法治总复习时事热点专题六倡导命运共同体 展现大国担当.pptx
文档评论(0)