- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国家自然科学基金申请标书的技术路线图个,简单就是美
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 号主变C级检修作业指导书.doc
- 各种房产过户费用综合详述.doc
- 史泰博进化史教你读懂史泰博经营模式.docx
- 各行业盈利模式分析.doc
- 合理利用密元件 降低常压装置泄漏率.doc
- 合理性的代和陷阱.doc
- 合理情绪行疗法REBT.doc
- 合理订货的据.doc
- 合成氨项节能技术.doc
- 合肥市中兴西湖花园三期商铺营销推广总案.doc
- 《网游企业虚拟商品销售收入审计风险研究》.docx
- 《理冲生髓饮有效组分对卵巢癌血管生成影响及JAK2-STAT3信号通路调控的机制研究》.docx
- 《健脾降脂散治疗高脂血症(痰浊遏阻型)的临床疗效观察》.docx
- 《基于多模态神经影像的轻度认知障碍进展预测研究》.docx
- 《地方财政自给能力扰动下转移支付对城乡基本公共服务均等化影响研究》.docx
- 《蜈蚣托毒丸联合臭氧水疗治疗寻常型银屑病(血热证)的临床观察》.docx
- 《膝下动脉硬化闭塞症治疗的临床疗效分析》.docx
- 《航空航天产业动态跟踪及趋势洞察月报(2024年7月)》范文.docx
- 《扩链和相容一体化相容改性剂的制备及PBAT材料性能的研究》.docx
- 《《醒来的女性》中女性主体性研究》.docx
文档评论(0)