- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
OA系统秘书使用手册
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- BS系统的用户权限设计与实现pdf.doc
- BC电子商务平台网络推广方案.doc
- bhd系列防爆接线盒和车载云台摄像机价格.docx
- bxd防爆动力配电箱和plc智能配电箱价格.docx
- bpc防爆平台灯和防尘防爆灯具价格.docx
- BDCOM BSR系列下一代交换式多业务路由器宣传彩页v.doc
- BC电子商务结合实体店发展的现状与前景分析.doc
- bxd防爆强光灯和防爆应急泛光灯价格.docx
- BYLA物流信息系统应用前沿研究.doc
- bxx防爆检修箱和防爆电源检修箱价格.docx
- 违约金与损害赔偿合同责任的强化保障.pptx
- 员工培训课件更新.ppt
- 浙江宁波市海曙区教育局招聘2025学年“专曙优师”教育人才65人(第一批)笔试模拟试题参考答案详解.docx
- 2025年应急管理部所属单位第二批次招聘笔试模拟试题附答案详解.docx
- 2023年广技师C语言复习题练习循环结构有答案.pdf
- 初中生自卑心理疏导指南.pptx
- 2024年河南洛阳汉魏故城遗址博物馆引进急需短缺专业硕士研究生方案笔试模拟试题及答案详解一套.docx
- 2024年江苏航运职业技术学院单招《英语》经典例题【重点】附答案详解.docx
- 2025年甘肃医学院引进高层次人才40人笔试模拟试题附答案详解.docx
- 2025年河南商丘师范学院招聘高层次人才笔试模拟试题附答案详解.docx
文档评论(0)