新版轮机英语unit39lesson 39.pptVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新版轮机英语unit39lesson39新版轮机英语unit39lesson39

Bunkering procedures should be followed as shown in the ships operation manual. The main points are listed in the following: Before bunkering The responsible engineer should consult with the chief officer in advance and make bunkering plan with consideration of, but not limited to the following items: √The movement of the vessel, date and time and place of the Bunkering. √FO volume (in metric ton). √Type of FO. √Viscosity (in Centi-stokes at 50℃). √Density The bunking plan must be approved by the chief engineer. Get every thing ready for bunkering, including but not limited to the following: √All scuppers plugged by carpenter (or bosun); √Save all put if necessary; √Pollution response tools and materials such as rags, sawdust and fire fighting equipment prepared; √Stop and start signal/order and pumping rate agreed; √Engine room staff appointed; communication system set up and tested; √Red light and B flag displayed; √Checklist finished. During bunkering √Tanks sounded from time to time; √Watch air vent for air flow; √Hose connection station manned all times; √pumping rate checked; √watch kept for leakage: √Slow down pumping rate and take sounding frequently when a tank nearly filled to 2/3; give stop signal to oil barge when need; S √If oil spill should occur, stop pump, report and initiate oil spillage response procedure right away; √Take oil samples. After bunkering √Check oil quantity (take temperature into consideration ); label oil samples; √The disconnected hose must be blinded in a collecting vessel before drawn back; √Make entry into Engine Log Book and Oil Record Book. LO control onboard Analysis of LO Sample The Chief Engineer shall submit the sample according to the standard with the following matters kept in mind: √The samples shall be put in an envelope or box used exclusively by the oil company and sent to the oil company directly. √The sample shall be collected at the same points every time (Select at the first time the best point where

文档评论(0)

cxiongxchunj + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档