- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测井质量控制
测井质量控制表 Log Quality Control This form is composed of four sections. Form-Ⅰ (General Information) should be completed by the oil company witness and logging company engineer prior to the logging operation. Form-Ⅱ(Planned Logging Program)should be completed by the oil company witness prior to the logging operation During and after logging Form-Ⅲ (Quality Control Check List) should be completed by the logging company engineer. Operation efficiency Form-Ⅳ should be completed by oil company witness at termination of logging. 旴oth the witness and the logging engineer should review this entire QC guide and examine the complete form prior to logging so that proper planning can be made to secure the needed information and to assure good log quality. 旾f Super combo must be run in deviated or sticky hole, discuss putting nuclear tools above sonic tool so that source can be recovered if sonic tool is pulled apart during fishing operation. 旸ownlog all toolsg(including tools with caliper arms closed)under the speed of 60 m/min if possible and recorded on tape. From—Ⅰ:General Information(To be completed by the oil company witness and logging company engineer before logging.Where applicable,list information as it should appear on the log heading.) Company: Logging Company: Well: Drilling Rig: Field/Prospect: Lease: Location: ° ′ ″ North X: m East ° ′ ″ East Y: m North Permanent Datum: Elev. Elev.: KB Log Measured From: M. above Perm DF Drilling Measured From: GL Date Hole Deviated Straight Run No. Max. Hole Angel: Deg. @ M Depth Driller Dog Legs: M Depth Logger Tight Spots in Hole: M Btm. Log Interval Top Log Interval Casing-Driller 20″ @ M 13-3/8″ @ M ″ @ M Casing-Logger @ M @ M @ M
您可能关注的文档
最近下载
- 《孩子是春天的另一种姿势》阅读练习及答案.doc VIP
- 2022-2023学年四川省成都市锦江区八年级(上)期末数学试卷.docx VIP
- T_CVMA 224-2025 猫传染性腹膜炎诊断规程.pdf VIP
- T_CVMA 232-2025 猪星状病毒五型荧光PCR检测方法.docx VIP
- T_CVMA 252-2025 马四肢X线及超声操作规范.pdf VIP
- 湿地博物馆施工组织设计(智能化系统).doc VIP
- 2022-2023学年四川省成都市锦江区嘉祥外国语学校八年级下学期期中数学试卷(含答案解析).docx VIP
- 浙教版(2023)五年级上册信息科技全册教学课件 .pdf VIP
- (正式版)D-L∕ T 790.6-2010 采用配电线载波的配电自动化 第6部分:A-XDR编码规则.docx VIP
- 商砼搅拌站电气系统培训教材.doc VIP
文档评论(0)