Raw water pipes.docVIP

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Raw water pipes 2 at the edge of the water pump room to carry on (757 m) per trip D1420 x 14 steel pipe to pipe jacking construction. Water from riverbanks to using underwater laying head, two D1420 x 14 (10.95 m) long. Underwater pipe rack in five sets of DN1400 steel pipe pile supporting frame (spacing for 20 m). River the lowest water level of 0.09 m, and the average level of 4.07 m, the design flood level of 9.55 m, pipe top surface elevation of 2.1 m. Set in the middle of the water pump room and consideration of pipe jacking work well. During pipe jacking in place, should be in the dry season to take out the head, and avoid the Yangtze river water not influx from the pipe for water pump room. Pipe jacking in place after the big some should cross the Yangtze filling cement and sodium silicate mixture around the pipeline, to avoid the gaps between the Yangtze river water from the pipe and the soil through the Yangtze river levee, grouting pipe length not less than 40 m. Produce osmosis phenomenon in order to avoid the Yangtze river water along the pipe, in the face of the water here is within the scope of set pressure grouting impervious wall, 31.5 x 5 x 12 m (tube up and down in the 6 m, pipes, stretched out on each side the centerline of the lateral 10 m), 19 m within the diaphragm wall is apart from the top. Grouting technology requirements are as follows: Type double liquid slurry by using cement and sodium silicate mixture, strength grade 32.5 (R) fresh ordinary silicate cement, with 2% sodium silicate, 10% 30% fly ash. Serous initial setting time is 2 h, grouting amount, grout injection rate was 20%, the slurry pressure 0.63 1.5 MPa, water cement ratio is not less than 0.5. (according to actual). When the spacing of 1.0, grouting the outside first, after the internal way of grouting. Steel pipe concrete pile should penetrate the first (3) silt layer into the first 4 layer of coarse sand layer is not less than 1.0 m. Pipe supports of C25 underwater co

文档评论(0)

taotao0c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档