Matters needing attention.docVIP

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Matters needing attention A, before rinsing to rinse solution, advance notice about the main water user. B, before rinsing check rinse water will affect the safety of the Yangtze river ships, assign personnel to safety monitoring in the process of washing. 8.3.1.10 pipeline anticorrosion Pipe production is completed on the internal and external anti-corrosion, set aside 100 mm so that the welding pipe jacking pipe end each joint well before after welding pipe jacking, after the interface corrosion in pipe jacking. Pipeline corrosion protection work in strict accordance with the construction requirements and design drawing standards. And approved by the owner, supervision, the local quality inspection departments qualified. 8.3.2 pile foundation construction Lower water head by six spacing for 5 m steel tube hole perfusion column, steel pipe for Φ 600 * 12 * 27419 mm, a total of 6, set the upper Φ 12 x 600 x 600 mm (adjustment) of steel pipe pile, steel pipe pile location after watering C25 concrete in steel pipe, steel pipe pile and steel pipe into the hole perfusion with flange connection between column. Underwater laying part there are 5 sets of (every 2 a) Φ 12 x 600 x 600 mm steel pipe piles, each steel pipe pile is composed of two D600 x 12 steel pipe pile, at 6.1 m set fittings between the two pipe pile. Upper pipe pile setting adjustment section, section and pile flange connection. Adjust the upper section set I40 beams, header, end plate and pipe groove, pipe falls within the tube slot, and pipe clamp fixed beams. Steel pipe pile location after watering C20 concrete in steel pipe. Steel pipe before pile driving after cleaning brush chlorosulfonated polyethylene, primer, intermediate paint, paint all along. Immediately after the pile foundation engineering of a construction project organization construction, because it is the key to restrict water head installed. Set a pile driving operation team. Before the construction need to quote the detailed cons

文档评论(0)

taotao0c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档