- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文文献:
GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGS
Y. C. HUANG
Department of Construction Management, Hwa Hsia Institute of Technology and Commerce, 111 Hwa Hsin Street,Chung Ho City, Taipei Hsien, Taiwan, Republic of China
Received 13 February 2004; accepted 4 March 2005
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide better scheduling results for each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) down–up construction, (b) building inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results of this study provide some quantitative information as a useful guide for scheduling RC building superstructures.
Keywords: Multistage scheduling, repetitive project, RC building, GMSM
Introduction
In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for this type of construction can not only increase profits but also reduce the impact on urban traffic.
Of the high-rise buildings constructed to date, the network planning technique has been commonly adopted in scheduling. The Critical Path Method (CPM) is the most popular one; for instanc
您可能关注的文档
- 建筑制图模试题.doc
- 建筑制图课标准.doc
- 建筑制图演稿85-86.ppt
- 建筑制图的础.doc
- 建筑力学与构课程设计.doc
- 建筑制图高学习资料.ppt
- 建筑力学第章_静定结构位移计算.ppt
- 建筑力学与构第一章.ppt
- 建筑卫生陶企业安全生产标准化评定标准 1.doc
- 建筑及装饰料11.doc
- 小学语文革命题材文本解读与情感培养策略探究教学研究课题报告.docx
- 《电子政务区块链系统在税收征管中的应用实践与效果评估》教学研究课题报告.docx
- 航空航天领域3D打印技术在航空航天结构件制造中的材料性能优化与工艺创新教学研究课题报告.docx
- 《金融科技监管与金融风险预警系统研究》教学研究课题报告.docx
- 《废弃电器电子产品回收处理产业链的废弃物处理政策与法规研究》教学研究课题报告.docx
- 高中交通安全教育实践与校园周边交通安全教育资源配置研究教学研究课题报告.docx
- 《基于精益生产的食品制造企业生产现场生产计划与执行研究》教学研究课题报告.docx
- 小学语文革命题材教学中的历史知识融入与教学效果分析教学研究课题报告.docx
- 《金融开放背景下我国期货市场国际化与跨境资金流动监管研究》教学研究课题报告.docx
- 《我国金融衍生品市场风险监管政策研究》教学研究课题报告.docx
文档评论(0)