The basic requirement of the construction process control survey.docVIP

The basic requirement of the construction process control survey.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ThebasicrequirementoftheconstructionprocesscontrolsurveyThebasicrequirementoftheconstructionprocesscontrolsurvey

The basic requirement of the construction process control survey 1. The positioning control network construction process, can use the original area of plane and elevation control network has been established, when meet the requirements of construction measurement technology, should be used. 2. The local potential flat, buildings, structures, uncluttered and try to deploy grid architecture as a factory of plane control network, so that construction work easier. Grid architecture is the main technical requirements, from the need to satisfy the precision of the general building location, precision estimate. Its setting USES secondary net encryption scheme. The head of building grid control, can use axis method or cloth mesh method. 1 P034 3. The building field is greater than 1 square kilometers or important industrial factories, should establish equivalent to level 1 wire precision of plane control network; Construction site less than 1 square kilometers or general building area, according to the need to establish the equivalent of secondary and tertiary wire precision of plane control network. 4. The structure of the control survey, should be arranged according to design requirements, the point should be chosen in good visibility and conducive to long-term preservation. Control network encrypted indication piles, should be built in the building in line or on the direction of the center line of the main equipment. Main control network and the main equipment center line endpoint, fixed peg should be buried concrete. Level of the building elevation control points, buried separately on the signs of the plane control network of the building, near the site can also use the level of point, the spacing should be around 200 mm. When the water in the construction on time cant save, it is necessary to introduce the elevation measurement to the solid buildings or structures. Lead the precision of measurement, should not be lower than the original level of grade requirement

文档评论(0)

cxiongxchunj + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档