- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SHANDONG POWER SECTOR FLUE GAS DESULPHURIZATION (FGD) PROJECT Environmental Management Plan Shandong Huangtai Power Plant October 2006 Table of Content 1. Project Introduction 2 2. Project Description 3 3. Environmental Management (Mitigation) Plan 6 4. Environmental Monitoring Plan (Construction Phase) 9 5. Institutional strengthening 11 6. Public Participation 12 1. Project Introduction Huangtai Thermal Power Plant (hereafter referred to as “HTTPP”) which is located in the joint area of Jinan development zone and industrial belt in the east, is established in Sep, 1958, it’s the first high-temperature and high-voltage coal-fired power plant in Shandong Province and now is one of the most important power plants of power grid in Shandong. At present, there’re seven boilers and eight steam turbine generator units with total installation of 1005 MW (3×25MW+1×50MW+2×110MW+2×330MW) and annual power generation can reach to 5~6 billion Kwh. From 1992, HTTPP commenced to retrofit 1#~6# units to expand the heating capacity to 800 t/h (120T/h +3×80T/h +2×220T/h), therefore HTTPP became the biggest heating supplier and responsible for the residential heating in the east of Jinan. The retrofitting program of 7# and 8# units with wet limestone-gypsum flue gas desulphurization (FGD) technology from 2002 has already finished and put into operation, the SO2 removal efficiency can reach to 95%, which contributed to improve the air quality in Jinan. It is forecasted that the heating demand in the east area will reach to 2,080t/h by 2010. However, the 1#~6# units for residential heating supply are installed in 1960~1980, the equipments are beyond or close to their service life and without any FGD facilities. According to the general plan of Jinan municipal development, Shandong LUNENG Development Group decided to launch Retrofitting Program of Heating Facilities in HTTPP, including replacing the former 1#~6# units with two new 400 TPH/300 MW co-generation units. And the FGD
您可能关注的文档
最近下载
- Unit 5 Play by the rules--单元话题满分范文(教师版)新版 2025年新外研版八年级上册.docx
- ISO9001:质量管理体系标准理解.pptx VIP
- 第四版(2025)国际压力性损伤溃疡预防和治疗临床指南解读PPT课件.pptx VIP
- 水泥生产环保知识培训课件.pptx VIP
- 物理一组卷高一上抛追击.pdf VIP
- 建设工程材料市场信息价查询-北京工程造价信息2025年第1期.doc VIP
- 一种用于吊篮停放的悬挑休息平台.pdf VIP
- CECS456-2016 格网土石笼袋、护坡工程袋应用技术规程(OCR).pdf
- 人教版语文小升初试卷含答案.docx VIP
- 水泥安全生产培训课件.ppt VIP
有哪些信誉好的足球投注网站
文档评论(0)