- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国2015年月自学考试00144企业管理概论试题答案
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install protective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance +10MM~ – 5mm , appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft materials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with specifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure that each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pipes and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down ... See next page flow chart management process. 7.2 General requirements for protective product protection
enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspe
您可能关注的文档
- 修浙江省200年度《全国建设工程造价员资格》考试试卷.doc
- 修试工区201年安规考试复习范围.doc
- 倒买倒卖银行承汇票的行为.doc
- 倒虹吸混凝土浇监理作业指导书.doc
- 倒虹管顶管施工织设计.doc
- 借经销商建立深分销体系.doc
- 债务重组会计与收处理(现金存货无形资产固定资产).doc
- 债务重组协议之押合同20140614.doc
- 倾听是最重要也基本的一项技巧.doc
- 做一名合格厨师必备的团队训练宝典.docx
- 2025年绿色装配式木结构建筑项目装配式建筑项目投资可行性研究报告.docx
- 农业科技园区建设与农业科技创新与产业升级报告.docx
- 农业科技园区建设与2025年农业产业链整合运营模式研究报告.docx
- 智能家居用户隐私安全顾虑调查:2025年技术应对策略研究报告.docx
- 商业银行金融科技人才金融科技合规与风险管理培养策略研究报告.docx
- 食品饮料行业包装材料生物降解性能研究与发展报告.docx
- 2025年电子病历系统在医院信息化中的智能医疗决策支持优化报告.docx
- 公司连带保证担保合同书10篇.docx
- 2025年短视频平台社会责任履行与内容治理策略分析报告.docx
- 农业科技园区建设与农业科技创新与农业科技园区产业发展规划研究报告.docx
文档评论(0)