- 1、本文档共48页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某国330kv线路施工组织设计说明—-施工组织设计.doc
EPC of ABC 330kV D/C
TRANSMISSION LINE PROJECT
Construction Management Plan
ABC Co., Ltd
April 5,2010
Prepared:
Checked:
Approved:
Chapter 1 Project Overview and Features
1. Project overview and features
1.1 project overview
Lot 1 330kV - B DC Line ( that is 286m in length ) ( hereinafter referred to as “AB Project”) is a project invested by NDPHC.
1.1.1 Length, voltage grade and erection type of the line
ABProject is located in the central area of N NATIONAL starting from A Substation in the south and ending in B substation in the north with the length of 279.449km. The project is located above sea level between 100m and 1300m with the voltage grade of 330kV. The double-circuit line will be erected on the same tower and self-supporting angle steel towers will be employed for the line.
1.1.2 Conductor, ground wire, OPGW and insulator
The conductor will be twin bundled and horizontally arranged with the model of BISON. The ground wires will be GJ-60 galvanized stranded wire and OPGW respectively. Glass insulators will be employed for the line. Twenty FC120/146 glass insulators will be employed in the tangent tower and 2X22 FC160/146 glass insulators in the strain tower.
1.1.3 Fountation type and earthing
Oblique Angle Inserted Foundation and horizontally radial earthing.
1.2 Analysis of construction condition
1.2.1 Construction condition at the site
● Medium sand, crushed stone resources are available along the line. Appropriate sand, stones may be provided.
● Influenced by climatic conditions, it is difficult to construct in rainy season at location of this project. Rainy season should be evaded as far as possible. However, since part of construction period for this project is arranged in rainy season. Preparations should be made for the construction proposal in rainy season. Construction period of the procedures should be arranged reasonably. Adverse factors should be considered suffi
您可能关注的文档
- 湖北省外事办公室住宅楼施工组织设计—-施工组织设计.doc
- 二号井主井临时改绞施工组织设计方案说明书(主提钢丝绳18×7+fc401960)—-施工方案书.doc
- 财富中心1#、2#楼施工组织设计—-施工组织设计.doc
- 江苏省华艺铝业工程有限公司外墙装饰工程施工组织设计—-施工组织设计.doc
- 资中县重狮路改建工程监理细则—-工程实用资料.doc
- 给排水工程施工安装工艺大全—-工程实用资料.doc
- 采区变电所施工作业规程—-工程实用资料.doc
- 某十五层框架结构工程脚手架施工方案说明书(落地式、悬挑式、卸载式)—-施工方案书.doc
- 坊子区北海路(胶济铁路潍莱高速立交桥)改造提升工程施工方案说明书—-施工方案书.doc
- 采区防突设计说明书—-工程实用资料.doc
- 柔性制造系统中工业机器人应用2025年技术升级优化分析报告.docx
- 2025年数据中心绿色能源项目实施指南.docx
- 中国适老化改造2025年市场需求与行业应用场景前瞻报告.docx
- 2025年数据中心绿色节能技术培训与人才培养研究报告.docx
- 2025年新能源车辆充电设施建设与市场分析报告.docx
- 医药电商配送环节物流服务质量评价与提升方案分析.docx
- 农村金融服务体系完善与农村金融政策优化研究.docx
- 智能影像诊断系统在2025年肿瘤早期筛查中的应用报告.docx
- 农业产业园项目农产品加工产业链延伸可行性研究与2025年效益评估报告.docx
- 2025年数据中心绿色节能技术在分布式能源系统中的应用报告.docx
文档评论(0)