Strengthen the settlement observation of nearby pipeline.doc

Strengthen the settlement observation of nearby pipeline.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Strengthen the settlement observation of nearby pipeline

Strengthen the settlement observation of nearby pipeline, timely data, ensure safety. 12, found that the surface monitoring records, buildings and pipelines around are abnormal, with analyzing, precipitation, when it is necessary to stop for reinforcement. 6.2.2.6.2.4 dewatering well control operation 6.2.2.6.2.4.1 precipitation test run Before starting the precipitation operation, accurate determination of the wellhead and the ground elevation, the determination of static water level, arrange pumping equipment, cables and pipes for the commissioning, to ensure that the water pumping system in good condition. Out of the water should be in the area around the drain, and then discharged into the municipal pipeline outside, so as not to take water in situ permeability, influence precipitation effect, shall be immediately discharge of rain water in pit digging unit outside the pit, to minimize infiltration of atmospheric precipitation and water in the pit. 6.2.2.6.2.4.2 precipitation formal operation 1, precipitation should run and cooperate with each other, excavation of dewatering well construction excavation and a half months in advance, dewatering well should be after the engineering pile, grouting construction, drainage in dewatering well construction phase should be side edge, namely after completing a few Wells should be take in precipitation and shall ensure that the excavation has about half a month of pumping time, to achieve good results in foundation pit drainage. 2, after the water level to the bottom, can close pump, after waiting for borehole water level rise should be open water pumps. 3, pumping clearance from short to long, each well drained after should stop pump, in order to prevent motor burn out. Rising water levels should immediately after the open pump for water yield larger pumping Wells every day to open pump frequency should be increased. 4, in the stage of excavation of foundation pit of rain water total package units shall promptly send some

文档评论(0)

abf4675328 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档