- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
R096-6000sp设计说明书-英文版
Design Instruction R096-SM-1 Prepared by: Reviewed by: Verified by: Approved by: Changsha Boiler Plant Co., Ltd PRC July, 2010 Content I Preface II Boiler Specification III Basic Size IV Brief Introduction of Structure of Boiler Proper Summary Drum and its internals Superheater Evaporator Economizer Framework Platform ladders Boiler walls I Preface According to the parameters requirement of cement kiln AQC tail gas, on the basis of our mature structure of waste heat boiler serial product and domestic and overseas latest cement kiln waste heat boiler, we developed the QC390/340- 28.4-1.6/325 waste heat boiler. It is a kind of waste heat boiler for pure low-temperature cement kiln waste heat power generation which fulfills the AQC tail gas waste heat recovery of 6000t/d clinker production of cement industry. This boiler can not only make effective use of the waste heat, but facilitate the operation of the following process, reducing the product cost and energy product, strengthening the company’s marketing competitiveness. Meanwhile, it also fit the national energy policy and will be an irresistible trend in the future. II Boiler Specification i) Exhaust gas parameters Flue gas flow 390000Nm3/h Flue gas inlet temperature 340℃ Flue gas dust load less than 80g/Nm3 Flue gas content (percent by volume): O2=4.68% N2=62.9% RO2=25.35% H2O=6.97% Blowdown rate 1% Boiler air leakage rate ≤2% III Basic size Drum height 27990mm Boiler width (center line distance between left and right column) 4740mm Boiler maximum width (including platform) 7840mm Boiler maximum depth (including raining shed) 31500mm IV Brief Introduction of Structure of Boiler Proper 1. Summary This boiler is vertical layout and double flue gas duct structure. The flue gas enters from the top of the boiler, and then passes superheat
您可能关注的文档
- Planmed Sphie Classic乳腺X射线机产品推荐书.doc
- Plastic Pocessing Machinery塑料加工机械.doc
- Photoshop速把人物图片转黑白素描画[-9-30].doc
- pleasant、lease等词的用法及练习.doc
- PLC实验指导书(or 测控专业09-12).doc
- PLMQ-4.8I快速冷却灭菌柜再验证方案yes.doc
- plot of Pide and Prejudice.doc
- PLC中压外场测试结报告_120520.doc
- PLM一体化IPD发项目管理方法和工具.doc
- PLC实验指导书(面打印50份(背面写答案),不要改动页面设置、段落格式).doc
最近下载
- 个人开通天然气委托书范本 .pdf VIP
- 2025-2026学年人教版(2024)小学体育与健康二年级(全一册)教学设计(附教材目录).docx
- MG-WD系列采煤机说明书.doc
- 2025年河南省高考物理试卷(含答案解析).docx
- 学堂在线网课《生活英语读写》课后作业单元考核答案.docx VIP
- 2025年第42届全国中学生物理竞赛预赛试题(学生版+解析版) .pdf VIP
- 安全牛:API安全技术应用指南(2024版).pdf VIP
- 2024年浙江省中考统考科学试卷试题真题(含答案解析).pdf VIP
- 《吴门验方》学习笔记.docx VIP
- 新目标大学英语-《综合教学教程》第四册(WELearn答案解析).DOC VIP
文档评论(0)