Laboratory and Field Testing of Precast Bridge Elements Used.pdfVIP

Laboratory and Field Testing of Precast Bridge Elements Used.pdf

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Laboratory and Field Testing of Precast Bridge Elements Used for Accelerated Construction Vernon W. Wineland Iowa State University 176 Town Engineering Building Ames, IA 50011 vernonw@iastate.edu F. Wayne Klaiber Iowa State University 176 Town Engineering Building Ames, IA 50011 vernonw@iastate.edu Thomas P. Schoellen Black Hawk County Courthouse 316 East Fifth Street, Suite 211 Waterloo, IA 50703 tschoellen@co.black-hawk.ia.us ABSTRACT Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBISB) system for use with accelerated construction. Individual components of the system have been tested in the Iowa State University Structural Laboratory, and the overall system was tested in the field. Using the BHC system, the bridge superstructure can be assembled in two days and the bridge opened to traffic as soon as the cast-in-place concrete connection between the precast panels has reached the required strength, which is usually one week. Precast components tested in the laboratory include two precast abutment caps, three different types of deck panel connections, and a precast abutment backwall. Load testing on the first abutment cap revealed that it had considerably more strength than was required. Therefore, the cap was modified to be more efficient. The original PMBISB panel connection was inefficient in the amount of time and concrete needed for construction. Thus, three other panel-to-panel connection designs were tested in the laboratory, one of which has already been used in the field. The final laboratory work was the service load and ultimate load testing of a precast abutment backwall panel. Field testing of the first precast bridge (L = 40 ft., W = 32 ft.) in Black Hawk County was performed in June of 2007. The testing investigated service load stresses, lateral load distribution characteristics, and overall global behavior of the system. This paper presents the results of the laboratory and field te

您可能关注的文档

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档