- 1、本文档共47页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SAP_MM模块介绍.ppt
This is a standard view of the procure to pay process and the most common. It may vary significantly based upon the company procedures, the products/services purchases and other factors. SAP allow businesses to tailor it to their needs. Starts with a requisition or need that needs to be filled. This can come from Planning (MRP), manually or other The purchase order is the document to fill the need: usually includes the vendor, cost/price, quantity, terms and other pertinent information. [ part one of the 3-way match] Notifying the vendor The goods are shipped and brought to the organization The goods are received (typically at the dock) and then put away [ part two of the three way match] An invoice is received from the vendor [third part of the 3-way match] After the tolerances/verification of the 3-way match are met a payment is made according to the terms agreed to on the purchase order. Requisitions can be created indirectly in the following ways: Via materials planning and control The component Consumption-Based Planning suggests materials that need to be ordered on the basis of past consumption or usage figures and existing stock levels. The order quantity and the delivery date are determined automatically. Via networks (from the component PS Project System) Requisitions are generated automatically from networks if: A material component with non-stock material or an external service component has been assigned to an operation and the indicator allowing automatic generation of requisitions immediately the network is saved has been set in the network. Via maintenance orders Requisitions are generated automatically from maintenance orders if: A material component with non-stock material has been assigned to an operation, or An operation with the control key for external services has been created. For further information, refer to the section Planning of an Order in the PM Maintenance Orders documentation. Via production orders (from the component PP Product
您可能关注的文档
- RXDLP技术方案.doc
- R制度执行力改版后.ppt
- R执行力周计划日结果培训会.ppt
- R执行力培训.ppt
- R执行力系统.ppt
- R执行力系统课程精华.ppt
- R必威体育精装版KPI绩效管理体系及薪酬分配.ppt
- R管理沟通与团队作业.ppt
- S&OP培训ppt.ppt
- S(学员版).ppt
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)